flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First-of-its-kind Starbucks built in just six days

Sustainability

First-of-its-kind Starbucks built in just six days

The store is set to open in Canada in mid-March.


By David Malone, Associate Editor | March 9, 2021
Starbucks exterior building design rendering

Renderings courtesy Starbucks

A new Starbucks store is set to open in Abbotsford, B.C., that was assembled in six days with near-zero construction waste. The store was designed to reduce the energy needs for heating and cooling compared to standard construction builds.

Nexii Building Solutions, a Vancouver-based green building company, designed, manufactured, and constructed the location, which includes in-store and drive-thru options. The panels for the store’s roof and walls were designed and manufactured offsite and then assembled on-site. Nexii panels create a thermally efficient, airtight envelope, meaning the Starbucks building will require less energy to heat and cool, greatly improving energy efficiency over its building lifecycle, and lowering operating costs.

The project is meant to represent a step forward in Starbucks’ aspirations to operate more efficient stores.

 

Starbucks sustainable building graphic

Related Stories

Building Technology | Nov 10, 2016

New system from MIT may help buildings monitor stress and damage over time

The computational model is being tested on MIT’s Green Building.

Resiliency | Nov 3, 2016

Future-proofing urban waterfronts

CallisonRTKL’s Nathan Cherry discusses hurricanes, the San Francisco waterfront, and how we can future-proof our urban waterfronts.

Sustainability | Nov 3, 2016

A development in Denmark looks to use agricultural waste to help power its buildings

The proposal is a mixture of agriculture and urban design.

Multifamily Housing | Oct 25, 2016

The Beacon will become the most sustainable residential tower in the world

Lumiere Developments says the building will generate enough energy to offer residents ‘Free Energy For Life.’

Urban Planning | Oct 20, 2016

Despite troubled development, Masdar City forges ahead

The detailed master plan for Phase 2 of Masdar City has been unveiled by CBT.

Green | Oct 12, 2016

Acting as a giant air purifier, this tower could help solve China’s pollution problem

The 23-ft tall tower operates almost entirely on wind energy.

Codes and Standards | Oct 10, 2016

New sustainable landscape development and management credential launched

GBCI offered the first testing opportunity Oct. 3 at Greenbuild

Codes and Standards | Oct 6, 2016

Obama administration will spend $80 million for smart cities initiatives

The technology is targeted for climate, transportation, resiliency.

Green | Oct 4, 2016

The Clear Orb is one of the shortlisted projects for 2016 Land Art Generator Initiative

Designed by Heerim Architects & Planners, The Clear Orb would produce just under 600 million gallons of clean water annually.

Sustainability | Oct 4, 2016

One World Trade Center officially awarded LEED Gold certification

The skyscraper received the certification despite a setback caused by Hurricane Sandy.

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021