flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Firestone names 2012 Master Contractor Award Winners

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.


By By BD+C Staff | March 14, 2012

Even the best designed commercial roofing system needs to be installed with expert skill to ensure long-lasting performance. To that end, Firestone Building Products Company, LLC, recognized 256 of its more than 3,000 licensed roofing contractors throughout the U.S., Canada and Mexico as 2012 Master Contractors. 

Throughout the past year, these esteemed installers upheld Firestone’s high standards for quality roofing system installation and outstanding service to earn this coveted industry distinction. Collectively, the 2012 winners have installed over 220 million square feet of warranted Firestone roofing systems on new construction and reroof applications in the last year.

Established in 1988, the Firestone Master Contractor program annually presents three distinct industry awards to a distinguished group of contractors based on a variety of criteria for quality workmanship and installation excellence:

Master Contractor Award

The Master Contractor Award recognizes first-rate Firestone-licensed contractors for the total square footage of quality roofing systems installed and Quality Points accumulated for receiving outstanding inspection ratings on Firestone Red Shield warranted RubberGard EPDM, UltraPly TPO, UNA-CLAD metal and asphalt-based roofing system installations. 

Inner Circle of Quality Award

Installers are eligible for the Inner Circle of Quality award by achieving 2012 Master Contractor status, installing a minimum of four warranted Firestone roofs in each of the last five years, maintaining at least 2 million square feet of Firestone roofs under warranty and achieving an annual Quality Incidence Rating (QIR) of 2.0 or less.  The Firestone QIR measures each contractor’s quality performance based on warranty repair incidences per million square feet under warranty.

President’s Club Award

The President’s Club Award distinguishes Master Contractors that have accrued the highest number of Quality Points for superior inspection ratings and total square footage of Firestone Red Shield warranted roofing system installations completed over the past year.

Firestone bestowed the prized Inner Circle of Quality Award to 170 firms and the prestigious President’s Club Award to 31 firms during an awards ceremony held in Waikoloa, Hawaii earlier this year. BD+C

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021