flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Firestone names 2012 Master Contractor Award Winners

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.


By By BD+C Staff | March 14, 2012

Even the best designed commercial roofing system needs to be installed with expert skill to ensure long-lasting performance. To that end, Firestone Building Products Company, LLC, recognized 256 of its more than 3,000 licensed roofing contractors throughout the U.S., Canada and Mexico as 2012 Master Contractors. 

Throughout the past year, these esteemed installers upheld Firestone’s high standards for quality roofing system installation and outstanding service to earn this coveted industry distinction. Collectively, the 2012 winners have installed over 220 million square feet of warranted Firestone roofing systems on new construction and reroof applications in the last year.

Established in 1988, the Firestone Master Contractor program annually presents three distinct industry awards to a distinguished group of contractors based on a variety of criteria for quality workmanship and installation excellence:

Master Contractor Award

The Master Contractor Award recognizes first-rate Firestone-licensed contractors for the total square footage of quality roofing systems installed and Quality Points accumulated for receiving outstanding inspection ratings on Firestone Red Shield warranted RubberGard EPDM, UltraPly TPO, UNA-CLAD metal and asphalt-based roofing system installations. 

Inner Circle of Quality Award

Installers are eligible for the Inner Circle of Quality award by achieving 2012 Master Contractor status, installing a minimum of four warranted Firestone roofs in each of the last five years, maintaining at least 2 million square feet of Firestone roofs under warranty and achieving an annual Quality Incidence Rating (QIR) of 2.0 or less.  The Firestone QIR measures each contractor’s quality performance based on warranty repair incidences per million square feet under warranty.

President’s Club Award

The President’s Club Award distinguishes Master Contractors that have accrued the highest number of Quality Points for superior inspection ratings and total square footage of Firestone Red Shield warranted roofing system installations completed over the past year.

Firestone bestowed the prized Inner Circle of Quality Award to 170 firms and the prestigious President’s Club Award to 31 firms during an awards ceremony held in Waikoloa, Hawaii earlier this year. BD+C

Related Stories

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021