flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Firestone names 2012 Master Contractor Award Winners

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.


By By BD+C Staff | March 14, 2012

Even the best designed commercial roofing system needs to be installed with expert skill to ensure long-lasting performance. To that end, Firestone Building Products Company, LLC, recognized 256 of its more than 3,000 licensed roofing contractors throughout the U.S., Canada and Mexico as 2012 Master Contractors. 

Throughout the past year, these esteemed installers upheld Firestone’s high standards for quality roofing system installation and outstanding service to earn this coveted industry distinction. Collectively, the 2012 winners have installed over 220 million square feet of warranted Firestone roofing systems on new construction and reroof applications in the last year.

Established in 1988, the Firestone Master Contractor program annually presents three distinct industry awards to a distinguished group of contractors based on a variety of criteria for quality workmanship and installation excellence:

Master Contractor Award

The Master Contractor Award recognizes first-rate Firestone-licensed contractors for the total square footage of quality roofing systems installed and Quality Points accumulated for receiving outstanding inspection ratings on Firestone Red Shield warranted RubberGard EPDM, UltraPly TPO, UNA-CLAD metal and asphalt-based roofing system installations. 

Inner Circle of Quality Award

Installers are eligible for the Inner Circle of Quality award by achieving 2012 Master Contractor status, installing a minimum of four warranted Firestone roofs in each of the last five years, maintaining at least 2 million square feet of Firestone roofs under warranty and achieving an annual Quality Incidence Rating (QIR) of 2.0 or less.  The Firestone QIR measures each contractor’s quality performance based on warranty repair incidences per million square feet under warranty.

President’s Club Award

The President’s Club Award distinguishes Master Contractors that have accrued the highest number of Quality Points for superior inspection ratings and total square footage of Firestone Red Shield warranted roofing system installations completed over the past year.

Firestone bestowed the prized Inner Circle of Quality Award to 170 firms and the prestigious President’s Club Award to 31 firms during an awards ceremony held in Waikoloa, Hawaii earlier this year. BD+C

Related Stories

| May 18, 2011

Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside

The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.

| May 18, 2011

New center provides home to medical specialties

Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.

| May 18, 2011

Improvements add to Detroit convention center’s appeal

Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.

| May 18, 2011

One of Delaware’s largest high schools seeks LEED for Schools designation

The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.

| May 18, 2011

Carnegie Hall vaults into the 21st century with a $200 million renovation

Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.

| May 17, 2011

Redesigning, redefining the grocery shopping experience

The traditional 40,000- to 60,000-sf grocery store is disappearing and much of the change is happening in the city. Urban infill sites and mixed-use projects offer grocers a rare opportunity to repackage themselves into smaller, more efficient, and more convenient retail outlets. And the AEC community will have a hand in developing how these facilities will look and operate.

| May 17, 2011

Architecture billings index fell in April, hurt by tight financing for projects

The architecture billings index, a leading indicator of U.S. construction activity, fell in April, hurt by tight financing for projects. The architecture billings index fell 2.9 points last month to 47.6, a level that indicates declining demand for architecture services, according to the American Institute of Architects.

| May 17, 2011

Sustainability tops the syllabus at net-zero energy school in Texas

Texas-based firm Corgan designed the 152,200-sf Lady Bird Johnson Middle School in Irving, Texas, with the goal of creating the largest net-zero educational facility in the nation, and the first in the state. The facility is expected to use 50% less energy than a standard school.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021