Even the best designed commercial roofing system needs to be installed with expert skill to ensure long-lasting performance. To that end, Firestone Building Products Company, LLC, recognized 256 of its more than 3,000 licensed roofing contractors throughout the U.S., Canada and Mexico as 2012 Master Contractors.
Throughout the past year, these esteemed installers upheld Firestone’s high standards for quality roofing system installation and outstanding service to earn this coveted industry distinction. Collectively, the 2012 winners have installed over 220 million square feet of warranted Firestone roofing systems on new construction and reroof applications in the last year.
Established in 1988, the Firestone Master Contractor program annually presents three distinct industry awards to a distinguished group of contractors based on a variety of criteria for quality workmanship and installation excellence:
Master Contractor Award
The Master Contractor Award recognizes first-rate Firestone-licensed contractors for the total square footage of quality roofing systems installed and Quality Points accumulated for receiving outstanding inspection ratings on Firestone Red Shield warranted RubberGard EPDM, UltraPly TPO, UNA-CLAD metal and asphalt-based roofing system installations.
Inner Circle of Quality Award
Installers are eligible for the Inner Circle of Quality award by achieving 2012 Master Contractor status, installing a minimum of four warranted Firestone roofs in each of the last five years, maintaining at least 2 million square feet of Firestone roofs under warranty and achieving an annual Quality Incidence Rating (QIR) of 2.0 or less. The Firestone QIR measures each contractor’s quality performance based on warranty repair incidences per million square feet under warranty.
President’s Club Award
The President’s Club Award distinguishes Master Contractors that have accrued the highest number of Quality Points for superior inspection ratings and total square footage of Firestone Red Shield warranted roofing system installations completed over the past year.
Firestone bestowed the prized Inner Circle of Quality Award to 170 firms and the prestigious President’s Club Award to 31 firms during an awards ceremony held in Waikoloa, Hawaii earlier this year. BD+C
Related Stories
MFPRO+ New Projects | Apr 16, 2024
Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn
The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.
Construction Costs | Apr 16, 2024
How the new prevailing wage calculation will impact construction labor costs
Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Market Data | Apr 16, 2024
The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024
Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.
Laboratories | Apr 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus
In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.
Codes and Standards | Apr 12, 2024
ICC eliminates building electrification provisions from 2024 update
The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.
Urban Planning | Apr 12, 2024
Popular Denver e-bike voucher program aids carbon reduction goals
Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.
Multifamily Housing | Apr 12, 2024
Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago
New 33-story Class A rental tower, designed by SCB, will offer 343 rental units.
Student Housing | Apr 12, 2024
Construction begins on Auburn University’s new first-year residence hall
The new first-year residence hall along Auburn University's Haley Concourse.