Built as working-class housing in the late 19th and early 20th Centuries, the wooden three-story homes still dominate some urban neighborhoods. Though they have fallen out of favor, the structures continue to provide affordable housing in areas badly in need of it.
As decision-makers consider how to preserve these buildings, one of the primary areas of concern is fire safety due to balloon framing construction. Homes built with balloon framing, with long, continuous lumber, offer an unobstructed path for fire to spread quickly from ground level to the attic and roof.
Fire stops between floors can be created in a variety of ways. Insulating foam sealant and nominal lumber like a 2x4 nailed at various distances to break up the balloon framing can help prevent fire from spreading.
Gut renovations can add more fire blocking to break up the exterior walls and retrofit flooring with more fire-resistant materials also helps. Renovations, can be costly, though, going well beyond $100,000 for even basic design changes.
Related Stories
Codes and Standards | Jun 29, 2020
New buildings can fall short of designed performance
Similar structures can produce different energy usage results.
Codes and Standards | Jun 25, 2020
Arc offers tools, analytics for safe workplace re-entry
Platform helps sustainability teams to collect data, benchmark progress, measure impact, and improve performance.
Codes and Standards | Jun 24, 2020
New API enables design and construction technology platforms to connect
Construction Specifications Institute offers “digital classification engine.”
Codes and Standards | Jun 23, 2020
State lawmakers encouraging transition to heat pumps for building heating
Policies aim to replace gas heaters with electric units.
Codes and Standards | Jun 22, 2020
Natl. Renewable Energy Labs, Cold Climate Research Ctr. team up on extreme weather research
Focus on renewable power, sustainable transportation, energy efficiency, and energy systems integration.
Codes and Standards | Jun 19, 2020
Demand for family rentals expected to jump over next few years
Developers’ focus on single, urban millennials leaves family market underserved.
Codes and Standards | Jun 17, 2020
AIA offers retail and office 3D models for reducing risk of COVID-19 transmission
For modifying stores and offices with 17-point architectural, engineering, and administrative framework.
Codes and Standards | Jun 17, 2020
Santa Fe is second city in the world to achieve LEED v4.1 Gold
New Mexico community gained credits for resilience planning, including public health crises.
Codes and Standards | Jun 15, 2020
NSF International’s Checked by NSF program helps businesses reopen safely
Includes third-party validation of COVID-19 preventive measures.
Codes and Standards | Jun 15, 2020
Workers want policy changes before they return to offices
More office cleaning, work from home opportunities, and staying home when sick among the desired adjustments.