Built as working-class housing in the late 19th and early 20th Centuries, the wooden three-story homes still dominate some urban neighborhoods. Though they have fallen out of favor, the structures continue to provide affordable housing in areas badly in need of it.
As decision-makers consider how to preserve these buildings, one of the primary areas of concern is fire safety due to balloon framing construction. Homes built with balloon framing, with long, continuous lumber, offer an unobstructed path for fire to spread quickly from ground level to the attic and roof.
Fire stops between floors can be created in a variety of ways. Insulating foam sealant and nominal lumber like a 2x4 nailed at various distances to break up the balloon framing can help prevent fire from spreading.
Gut renovations can add more fire blocking to break up the exterior walls and retrofit flooring with more fire-resistant materials also helps. Renovations, can be costly, though, going well beyond $100,000 for even basic design changes.
Related Stories
Codes and Standards | Jul 29, 2020
Crackdowns grow on construction firms that fail to follow COVID-19 guidelines
States, cities, and OSHA enforce social distancing, hand-washing regulations.
Codes and Standards | Jul 28, 2020
California utility adopts climate emergency declaration
Sacramento-region company commits to working towards carbon neutrality by 2030.
Codes and Standards | Jul 27, 2020
Updated Energy Plus and OpenStudio building energy modeling tools released
Software offers performance enhancements.
Codes and Standards | Jul 23, 2020
North Carolina will stop relying on FEMA flood mapping
State will identify flood zones on its own.
Codes and Standards | Jul 22, 2020
New version of IAPMO’s Water Demand Calculator is available
Enhanced features include selection between single- and multifamily buildings.
Codes and Standards | Jul 22, 2020
Mobile app calculates sound transmission for wood-framed assemblies
American Wood Council tool for floor-ceiling assemblies.
Codes and Standards | Jul 22, 2020
Architecture billings remain in negative territory, begin to stabilize
Fewer architecture firms report declining billings this month.
Codes and Standards | Jul 20, 2020
N.Y. construction firm to pay $1.5 million to settle sexual harassment claim
Managers said to demand sex for pay and OT opportunities.
Codes and Standards | Jul 16, 2020
Tips to make optimal use of salvaged materials
Integrated teams, staging warehouse, and looking early and often, among recommendations.
Codes and Standards | Jul 15, 2020
Georgia gives the go-ahead for tall mass timber construction
Standards review scheduled to be completed by July 2021.