Fire-rated glass separation helps merge new and old pools into a single connected aquatics center

Sponsored Content

Fire-rated glass separation helps merge new and old pools into a single connected aquatics center

Clear fire-rated glazing helps create a light-filled, safe space for student athletes and spectators in Niles, Illinois


By Technical Glass Products | May 11, 2015
Fire-rated glass separation helps merge new and old pools into a single connected aquatics center

Clear fire-rated glazing transfers daylight. Image courtesy of TGP.

Ancient philosophers theorized four elements comprised the universe: earth, air, water and fire. The latter two of these figure prominently in the design of the Niles North High School Aquatics Center in Skokie, Il., a suburb of Chicago.

On behalf of its client, the Niles Township High School District 219, Legat Architects (Chicago) designed an “expansion and renovation of the aquatics center to improve competitive and educational swimming programs, promote community participation and enhance safety.”

Designed to meet LEED for Schools Gold environmental criteria, a key aspect of the project was a 24,600-sf addition to the school’s existing pool complex. The addition’s defining visual features include a dramatically curving roof with clerestory over the new pool, and a glazed curtain wall rising up to match the roof’s curve. The light-filled space creates the ambiance of an outdoor pool for student athletes and spectators.

While the water element is clear in the swimming pools, the fire element factors in with the use of fire-rated glazing systems from Technical Glass Products (TGP).

“We needed to provide a two-hour fire-rated separation between the existing building and the new addition, but we wanted the facility to read as a single aquatics center,” explained Michael Maloney, LEED AP BD+C, design director for Legat Architects. “A visual connection between pools was crucial for the concept, as well as for safety and security. The Fireframes® Curtainwall Series frames and Pilkington Pyrostop® glass from TGP allowed us to meet the fire requirements, while maintaining the visual connection between the existing and new parts of the building.”


TGP’s Fireframes® Curtainwall Series frames
 

Fireframes Curtainwall Series frames are available with fire-ratings up to 120 minutes, and feature narrow profiles to reduce sightlines. The UL classified and labeled steel frames enable large, multi-story expanses of glass in interior and exterior applications. Also available with up to 120 minute fire ratings, Pilkington Pyrostop glazing is impact safety rated and blocks the transfer of radiant heat.

For more information on the Fireframes Curtainwall System and Pilkington Pyrostop, along with TGP’s other fire-rated glass and framing, visit www.fireglass.com

 

Technical Glass Products 

800.426.0279
800.451.9857 – fax
sales@fireglass.com
www.fireglass.com

Related Stories

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

| May 21, 2012

Winchester High School receives NuRoof system

Metal Roof Consultants attended a school board meeting and presented a sloped metal retrofit roof as an alternative to tearing off the existing roof and replacing it with another flat roof.

| May 8, 2012

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.

| Mar 5, 2012

Perkins Eastman pegs O’Donnell to lead K-12 practice

O’Donnell will continue the leadership and tradition of creative design established by firm Chairman and CEO Bradford Perkins FAIA, MRAIC, AICP in leading this market sector across the firm’s 13 offices domestically and internationally.

| Dec 27, 2011

USGBC’s Center for Green Schools releases Best of Green Schools 2011

Recipient schools and regions from across the nation - from K-12 to higher education - were recognized for a variety of sustainable, cost-cutting measures, including energy conservation, record numbers of LEED certified buildings and collaborative platforms and policies to green U.S. school infrastructure.

| Dec 5, 2011

RJM Construction begins building Nova Classical Academy in St. Paul

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. 

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| Sep 12, 2011

LACCD’s $6 billion BIM connection

 The Los Angeles Community College District requires every design-build team in its massive modernization program to use BIM, but what they do with their 3D data after construction is completed may be the most important change to business as usual.

| Jul 22, 2011

Five award-winning modular innovations

The Modular Building Institute's 2011 Awards of Distinction highlight fresh ideas in manufactured construction projects.

boombox1
boombox2
native1

More In Category




K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021