flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Figure-eight shaped hotel to open around PyeongChang 2018 Winter Olympics Facility

Hotel Facilities

Figure-eight shaped hotel to open around PyeongChang 2018 Winter Olympics Facility

Just three miles away from the Olympic stadiums, the hotel will be a hub of its own.


By BD+C Staff | April 13, 2015
Figure-eight shaped hotel to open around PyeongChang 2018 Winter Olympics Facility

The sprawling 317,460-sf site will host a variety of marine and mountain recreation facilities. Renderings courtesy Planning Korea

In preparation for the 2018 Winter Olympics in PyeongChang, South Korea, Seoul-based firm Planning Korea unveiled an angular infinite-sign shaped seaside hotel to host visitors.

ArchDaily reports that in addition to the 946 hotel rooms offered, the building will also have condo units for sale. The main building will sit on a sprawling 317,460-sf site, which will host a variety of marine and mountain leisure facilities within the hotel’s complex.

Rooftop gardens are terraced throughout the structure, making the sloping sections of the building reminiscent of a traditional Korean hanok village. On the lower levels, restaurants and retail space will be interspersed, adding to the village atmosphere.

The hotel will only be 3.1 miles away from the Olympic stadiums and facilities, which are expected to be completed in 2016.

According to the firm, the hotel’s figure-eight form was inspired by the ecological structure of the plankton.

For more on the hotel, visit ArchDaily.

 

Related Stories

| Jan 31, 2013

Map of U.S. illustrates planning times for commercial construction

Stephen Oliner, a UCLA professor doing research for the Federal Reserve Board, has made the first-ever estimate of planning times for commercial construction across the United States.

| Jan 31, 2013

More severe wind storms should prompt nationwide reexamination of building codes, says insurance expert

The increased number and severity of storms with high winds nationally should prompt a reexamination of building codes in every community, says Mory Katz, vice president, Verisk Insurance Solutions Commercial Property, Jersey City, N.J.

| Nov 11, 2012

Greenbuild 2012 Report: Hospitality

Hotel boom signals good news for greener lodging facilities

| Aug 9, 2012

DSGW Architects welcomes new employees

Three new employees located in DSGW's Duluth office.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jun 13, 2012

Is it time to stop building convention centers?

Over the last 20 years, convention space in the United States has increased by 50%; since 2005, 44 new convention spaces have been planned or constructed in this country alone.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

5 military construction trends

Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021