flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fairfax County, Va., considers impactful code change to reduce flood risk

Fairfax County, Va., considers impactful code change to reduce flood risk

New developments would have to be resistant to 100-year floods instead of 10-year events.


By Peter Fabris, Contributing Editor | September 16, 2022
Fairfax County Floods
Courtesy Pexels.

Fairfax County, Va., in the Washington, D.C., metro region is considering a major code change to reduce the risk from floods.

The county is reviewing a proposal to base codes on 100-year storms instead of current 10-year storms. County staff cited the elevated risk of flooding in the county due to climate change as justification for the change.

Under the proposal, the county would require all future development to have proper drainage, pipe conveyance, and safety measures to be resilient to a 100-year storm event, adjusting for climate change. A “100-year storm event” is defined by the U.S. Geological Survey as one that statistically has a 1% chance of occurring in any given year. Such a storm would dump about 8 inches of rain over a 24-hour period on the county.

As the effects of climate change increase, that rainfall figure is likely to be adjusted in the future.

Related Stories

| Apr 30, 2012

Virginia Commonwealth unveils design for Arts Institution

Institute for Contemporary Art will serve as a catalyst for exhibitions, programs, research and collaboration.

| Apr 30, 2012

Summit Design + Build completes build-out for Office Concepts

The project is seeking LEED ID Silver certification from the U.S. Green Building Council.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 30, 2012

Gilbane to manage retrofit of the Fraunhofer CSE R&B structure

Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.

| Apr 30, 2012

KBE Building completes renovation at the ConnCAT

The $1.2 million project consisted of a 16,000-sf interior renovation.

| Apr 27, 2012

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.

| Apr 27, 2012

APA launches wood design web portal for building and design pros

Design professionals who are members of APA’s Professional Associates are automatically enrolled in the APA Designers Circle program.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 27, 2012

CSM Group names Comerford as senior project manager

Comerford’s responsibilities include directing and verifying contract compliance by the trade contractors to ensure the owner’s expectations are met in respect to a quality finished project.

| Apr 27, 2012

Hampton Bays Middle School winner of the first National Green Ribbon Schools Program

School was the first LEED-certified public school in the state of New York.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021