flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fairfax County, Va., considers impactful code change to reduce flood risk

Fairfax County, Va., considers impactful code change to reduce flood risk

New developments would have to be resistant to 100-year floods instead of 10-year events.


By Peter Fabris, Contributing Editor | September 16, 2022
Fairfax County Floods
Courtesy Pexels.

Fairfax County, Va., in the Washington, D.C., metro region is considering a major code change to reduce the risk from floods.

The county is reviewing a proposal to base codes on 100-year storms instead of current 10-year storms. County staff cited the elevated risk of flooding in the county due to climate change as justification for the change.

Under the proposal, the county would require all future development to have proper drainage, pipe conveyance, and safety measures to be resilient to a 100-year storm event, adjusting for climate change. A “100-year storm event” is defined by the U.S. Geological Survey as one that statistically has a 1% chance of occurring in any given year. Such a storm would dump about 8 inches of rain over a 24-hour period on the county.

As the effects of climate change increase, that rainfall figure is likely to be adjusted in the future.

Related Stories

| May 10, 2012

Chapter 2 Exemplary High-Performance Reconstruction Projects

Several case studies show how to successfully renovate existing structures into high-performance buildings.

| May 9, 2012

Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings

As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.

| May 9, 2012

International green building speaker to keynote Australia’s largest building systems trade show

Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.

| May 9, 2012

Tishman delivers Revel six weeks early

Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.

| May 9, 2012

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.

| May 9, 2012

Shepley Bulfinch given IIDA Design award for Woodruff Library?

The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.

| May 9, 2012

Construction Defect Symposium will examine strategies for reducing litigation costs

July event in Key West will target decision makers in the insurance and construction industries.

| May 8, 2012

WDMA and AAMA release window, door & skylight market studies

Historic data for 2006 through 2011 and forecast data for 2012 through 2015 are included in the report.

| May 8, 2012

Study presents snapshot of domestic violence shelter services

Unique partnership of architects and domestic violence advocates brings new strategies for emergency housing.

| May 8, 2012

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021