evolv1, a multi-tenant commercial office building under construction in Waterloo, Ont., was awarded Zero Carbon Building – Design certification by the Canada Green Building Council (CaGBC). It is the first building to earn this award.
In order to earn the certification, evolv1 needed to show it has modeled a zero carbon balance for future operations, incorporated a highly efficient envelope and ventilation system to meet a defined threshold for thermal energy demand intensity, and designed onsite renewable energy systems capable of providing a minimum of 5% of building energy consumption. Over the first 12 months of operation, evolv1 will monitor performance to demonstrate it has achieved a zero emissions balance.
The high-performance building envelope incorporates triple glazing, a solar wall for preheated ventilation, a geo-exchange/VRF HVAC system, a three-story green wall, and a combination of photovoltaics. The building is also targeting LEED Platinum certification and will produce more energy than it consumes.
The Cora Group developed the project, which is slated for completion in summer 2018, Stantec designed and engineered it, and Melloul Blamey is building it.
Related Stories
| Mar 8, 2011
Building, energy performance rating site launched
The Institute for Market Transformation and the Natural Resources Defense Council announced the launch of BuildingRating.org, the world’s first comprehensive resource on energy performance rating and disclosure policies for commercial buildings and homes.
| Mar 2, 2011
New ASHRAE standard may be too broad for the Canadian market
New Standard 189.1 from the American Society of Heating, Refrigeration, and Air-conditioning Engineers (ASHRAE), which goes beyond energy efficiency to include provisions that affect construction, post-occupancy monitoring, and site control, may be too much for the Canadian market—at least for now.
| Mar 1, 2011
Honeywell to implement China’s first smart grid project for managing energy use in commercial buildings
Honeywell announced it was selected to develop and implement China’s first smart grid pilot project and feasibility study for managing energy use in commercial buildings, also known as demand-side management. The project is part of a grant agreement signed today between the U.S. Trade and Development Agency (USTDA) and State Grid Electric Power Research Institute (SGEPRI), sponsor of the project and a subsidiary of State Grid Corp. of China.
| Feb 22, 2011
Military tests show copper increases HVAC efficiency, reduces odors
Recent testing, which is being funded by the Department of Defense, is taking place in military barracks at Fort Jackson, South Carolina. Side-by-side comparisons demonstrate that air conditioning units made with copper suppress the growth of bacteria, mold, and mildew that cause odors and reduce system energy efficiency.
| Feb 10, 2011
Zero Energy Buildings: When Do They Pay Off in a Hot and Humid Climate?
There’s lots of talk about zero energy as the next big milestone in green building. Realistically, how close are we to this ambitious goal? At this point, the strategies required to get to zero energy are relatively expensive. Only a few buildings, most of them 6,000 sf or less, mostly located in California and similar moderate climates, have hit the mark. What about larger buildings, commercial buildings, more problematic climates? Given the constraints of current technology and the comfort demands of building users, is zero energy a worthwhile investment for buildings in, for example, a warm, humid climate?