evolv1, a multi-tenant commercial office building under construction in Waterloo, Ont., was awarded Zero Carbon Building – Design certification by the Canada Green Building Council (CaGBC). It is the first building to earn this award.
In order to earn the certification, evolv1 needed to show it has modeled a zero carbon balance for future operations, incorporated a highly efficient envelope and ventilation system to meet a defined threshold for thermal energy demand intensity, and designed onsite renewable energy systems capable of providing a minimum of 5% of building energy consumption. Over the first 12 months of operation, evolv1 will monitor performance to demonstrate it has achieved a zero emissions balance.
The high-performance building envelope incorporates triple glazing, a solar wall for preheated ventilation, a geo-exchange/VRF HVAC system, a three-story green wall, and a combination of photovoltaics. The building is also targeting LEED Platinum certification and will produce more energy than it consumes.
The Cora Group developed the project, which is slated for completion in summer 2018, Stantec designed and engineered it, and Melloul Blamey is building it.
Related Stories
| Jun 28, 2011
Business case for net-zero
BD+C Editorial Director Robert Cassidy talks to Philip Macey, AIA Haselden Construction, about the cost and effect of net-zero buildings.
| Jun 1, 2011
Low-energy fans help combat disease in Rwandan clinic
Isis fans from Big Ass Fan Co. help kill airborne pathogens in Rwanda’s Butaro Health Clinic by passing air over UV lights.
| May 25, 2011
Smithsonian building $45 million green lab
Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.