flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

In an era of mixed signals, architects embrace cautious optimism [2013 Giants 300 Report]

In an era of mixed signals, architects embrace cautious optimism [2013 Giants 300 Report]

Are architecture firms finally pulling out of the doldrums? The answer is a tentative yes, according to AIA Chief Economist Kermit Baker.


By Robert Cassidy, Editorial Director | July 15, 2013
Inspired by Arizonas iconic canyon formations, the Health Sciences Education Bu
Inspired by Arizonas iconic canyon formations, the Health Sciences Education Building at the Phoenix Biomedical Campus brings together health sciences education and research programs from the University of Arizona College of Medicine-Phoenix and Northern Arizona University. The Building Team included CO Architects (executive and design architect); Ayers Saint Gross (associate architect); and DPR Construction and Sundt Construction (joint GC).
This article first appeared in the BD+C July 2013 Issue issue of BD+C.
Are architecture firms finally pulling out of the doldrums? The answer is a tentative yes, according to AIA Chief Economist Kermit Baker, PhD, Hon. AIA.
 
Baker points to the AIA’s Architecture Billings Index, a leading economic indicator of construction activity that reflects the approximate nine- to 12-month lag time between architecture billings and construction spending. The ABI experienced its first drop in nine months last April (to 48.6), but bounced back in May to 52.9 (any score above 50 indicates an increase in billings). The new projects inquiry index was 59.1, up slightly from the reading of 58.5 in April.
 
“This rebound is a good sign for the design and construction industry and hopefully means that April’s negative dip was a blip rather than a sign of challenging times to come,” says Baker.  “But there is a resounding sense of uncertainty in the marketplace—from clients to investors and an overall lack of confidence in the general economy—that is continuing to act as a governor on the business development engine for architecture firms.”
 
On a regional basis, the Northeast (at 53.7), West (52.1), and South (50.9) were still positive, while the Midwest lagged, at 47.5. Multifamily residential remains strong, at 52.8, as do institutional (52.2) and mixed practice (51.0), but the commercial/industrial sector is still hurting, at 47.5.

TOP ARCHITECTURE FIRMS

2012 Total Revenue ($)
1 Gensler $807,143,550
2 Perkins+Will $360,300,000
3 NBBJ $187,017,000
4 Kohn Pedersen Fox Associates $153,821,100
5 Perkins Eastman $145,000,000
6 Callison $134,112,565
7 ZGF Architects $107,412,274
8 Corgan $85,377,040
9 Populous $84,000,000
10 HMC Architects $77,986,678
 

TOP ARCHITECTURE/ENGINEERING FIRMS

2012 Total Revenue ($)
1 Stantec $467,254,421
2 HOK $406,780,000
3 HDR Architecture $325,900,000
4 Skidmore, Owings & Merrill $281,686,000
5 IBI Group $252,552,343
6 HKS $240,300,000
7 RTKL Associates $202,823,000
8 Cannon Design $202,000,000
9 SmithGroupJJR $166,600,000
10 DLR Group $116,400,000
“All the roadblocks are easing a bit, but they’re still they’re,” says Baker. “Financing is still a big problem, and banks are still hesitant to make a real estate loan. They’re still gun-shy, so they’re setting the bar high for loan approvals.”
 
SEVERAL SECTORS STILL CLICKING
Looking more closely at specific sectors over the next three years, Baker sees vacancy rates for apartments increasing, from 5.0% today to 5.2% in 2015, and rental rates declining, from 3.8% now to 2.8% in a couple of years—in other words, somewhat negative fundamentals for the multifamily sector.
 
    Giants 300 coverage of Architecture Firms brought to you by Sage www.sageglass.com    
Similarly, revenue per available room at hotels is expected to drop from a high of 6.8% in 2012 and 5.5% currently, to 5.0% in 2014 and 2015. But occupancy rates should remain steady, in the 63% range.
 
Overall, Baker foresees positive fundamentals for several key sectors. The office market should witness declining vacancy rates, from 15.4% in 2012 to 13.6% in 2015, and improved rental rates increases, to 4.0% over the next two years, from 3.5% today. Ditto for retail and industrial/warehouse, where market fundamentals also look positive through 2015, in Baker’s analysis.
 
As for the healthcare sector, the AIA economist says that, in his opinion, the Affordable Care Act can only benefit construction of new facilities. “With 30 or 40 million more Americans coming on to the system, it’s hard to come up with a scenario that’s bad for healthcare construction,” he says. “You’ve got to increase it.”
 
As for education, Baker says he wonders if universities are going to be able to keep up the construction wars for fancy new student unions, recreation centers, and the like. “The little echo boom demographic bubble has passed, and institutions are going to have to be more reasonable” in what they can afford to build, he says. In the K-12 arena, Baker says many schools that were built in the ’60s and ’70s may have to be replaced, whether or not the demographics support the case.
 
GOOD TIME FOR DESIGN FIRMS TO GET INTO ACTION
What do all these numbers mean to architecture firms, whether a boutique or midsize emerging firm, or a Giants300 market leader?
According to Baker, larger firms survived the downturn the best. “We heard a lot of stories of clients trading up, getting big firms to do work for them, firms that wouldn’t have bothered with such clients in the past,” he says.
 
Baker sees the possibility of more consolidation in coming years. “The classic case was the big engineering/architecture firm buying up an architecture firm to broaden the base of its offerings,” says Baker. He thinks more alliances may also be formed in years ahead—an East Coast firm that’s strong in the education sector linking up with a West Coast healthcare leader, for example, to strengthen their overall positions in the national market.
 
Baker, who has been through his share of recessions in his 28-year career as an economist, remains optimistic about the profession of architecture. “I do think it’s a great time to be in the profession, and if you own a firm, you’re going to see modest to firm growth in the next few years.”
 
The downside risk of taking aggressive action has begun to diminish, says Baker. His advice to management of architectural firms: “To the extent that they’ve been thinking about doing something for a while—opening a new office in a promising geographic market, making an acquisition—this is probably a good time to pull the trigger.” 
 

Read BD+C's full Giants 300 Report

Tags

Related Stories

University Buildings | May 30, 2024

Washington University School of Medicine opens one of the world’s largest neuroscience research buildings

In St. Louis’ Cortex Innovation District, Washington University School of Medicine recently opened its new Jeffrey T. Fort Neuroscience Research Building. Designed by CannonDesign and Perkins&Will, the 11-story, 609,000-sf facility is one of the largest neuroscience buildings in the world.

Affordable Housing | May 30, 2024

General contractor’s keys to a successful affordable housing project

General contractors can have tremendous influence over a project’s success in terms of schedule, budget, and quality. However, to ensure a project is put on this path, there are a few factors that must be considered.

K-12 Schools | May 30, 2024

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.

MFPRO+ New Projects | May 29, 2024

Two San Francisco multifamily high rises install onsite water recycling systems

Two high-rise apartment buildings in San Francisco have installed onsite water recycling systems that will reuse a total of 3.9 million gallons of wastewater annually. The recycled water will be used for toilet flushing, cooling towers, and landscape irrigation to significantly reduce water usage in both buildings.

Healthcare Facilities | May 28, 2024

Healthcare design: How to improve the parking experience for patients and families

Parking is likely a patient’s—and their families—first and last touch with a healthcare facility. As such, the arrival and departure parking experience can have a profound impact on their experience with the healthcare facility, writes Beth Bryan, PE, PTOE, PTP, STP2, Principal, Project Manager, Walter P Moore.

Urban Planning | May 28, 2024

‘Flowing’ design emphasizes interaction at Bellevue, Wash., development

The three-tower 1,030,000-sf office and retail development designed by Graphite Design Group in collaboration with Compton Design Office for Vulcan Real Estate is attracting some of the world’s largest names in tech and hospitality. 

MFPRO+ News | May 28, 2024

ENERGY STAR NextGen Certification for New Homes and Apartments launched

The U.S. Environmental Protection Agency recently launched ENERGY STAR NextGen Certified Homes and Apartments, a voluntary certification program for new residential buildings. The program will increase national energy and emissions savings by accelerating the building industry’s adoption of advanced, energy-efficient technologies, according to an EPA news release. 

Women in Design+Construction | May 28, 2024

Commerce Department launches Million Women in Construction Community Pledge

The U.S. Department of Commerce launched its Million Women in Construction Community Pledge this month to boost the ranks of women in construction companies. Federal investments are creating a construction boom that is increasing job opportunities for construction and trade workers.

Laboratories | May 24, 2024

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 

MFPRO+ News | May 24, 2024

Austin, Texas, outlaws windowless bedrooms

Austin, Texas will no longer allow developers to build windowless bedrooms. For at least two decades, the city had permitted developers to build thousands of windowless bedrooms.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021