flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Engineering Innovation Hub completes on SUNY New Paltz campus

University Buildings

Engineering Innovation Hub completes on SUNY New Paltz campus

Urbahn Architects designed the project.


By David Malone, Associate Editor | September 23, 2019
SUNY New Paltz EIH

Photo by Ola Wilk/Wilk Marketing Communications

The State University of New York (SUNY) at New Paltz’s new Engineering Innovation Hub (EIH) has recently completed construction. 

Designed by Urbahn Architects, the two-story EIH was built on a former parking lot on SUNY New Paltz’s main campus. It was designed to allow for a potential expansion to the east if the program requires more space in the future. 

The $13.5million, 19,500-sf building houses the College’s bachelor’s degree program in mechanical engineering, teaching and research lab spaces, 3D print prototyping labs, and the school’s Hudson Valley Additive Manufacturing Center (HVAMC). 

 

EIH lobbyPhoto by Ola Wilk/Wilk Marketing Communications.

 

The HVAMC’s collection of 3D printers are some of the most advanced technology at any academic laboratory in the United States, according to the university. SUNY is the first institution of higher education in the country to be designated a Stratasys-MakerBot Additive Research & Teaching (or SMART) lab by Stratasys, a 3D printing hardware and systems company.

See Also: St. Louis Community College Center for Nursing and Health Sciences opens to students

 

EIH teaching labPhoto by Ola Wilk/Wilk Marketing Communications.

 

The building welcomes students via a 661-sf entrance lobby designed to foster collaboration. It features display cabinets for 3D-printed artifacts, counters with computer charging and data outlets, lounge-style seating, and whiteboards. The building’s first floor also features seating niches within the hallways along the windows that integrate with benches, data access, and charging stations. A 1,900-sf teaching lab includes polished-concrete floors and painted steel columns, beams, and a metal deck ceiling. The HVAMC space is located on the first floor across from the teaching lab. An 850-sf machine shop, mechanical and electrical rooms, and public bathrooms round out the first floor.

 

Photo by Ola Wilk/Wilk Marketing Communications.

 

The second floor is home to a smaller lounge/collaborative space at the end of its main corridor, eight faculty offices, an open office space, a 300-sf conference room, three research/teaching labs, and a 1,200-sf computer lab.

The EIH is centrally located on the SUNY campus and was designed to meet LEED Silver certification requirements.

Also on the Build Team: PC Construction (gc), Vanderweil Engineers (mechanical and electrical engineer), Leslie E. Robertson Associates (structural engineer) BET Engineering Consultants (civil engineer), and Edgewater Design (landscape designer).

 

Photo by Ola Wilk/Wilk Marketing Communications.

 

Mechanical engineering students perform a compressiontestPhoto courtesy of SUNY New Paltz.

Related Stories

Sustainability | Oct 9, 2017

New Arizona State University building will reach triple net-zero performance

The science and research complex will include an atrium biome filled with plants and water.

Higher Education | Sep 18, 2017

Campus landscape planning of the future: A University of Wisconsin-Madison case study

Recognizing that the future health of the campus and lake are interdependent, this innovative approach will achieve significant improvements in stormwater management and water quality within the university’s restored, more connected network of historic and culturally rich landscapes.

University Buildings | Sep 15, 2017

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

In 2016, more than 400 students were placed on the wait list due to lack of available on-campus housing.

Sports and Recreational Facilities | Sep 11, 2017

Mid-size, multi-use arenas setting a trend for the future

While large 20,000-seat sports venues aren’t going away, mid-size venues provide advantages the big arenas do not in a time of budget constraints and the need for flexibility.

Giants 400 | Sep 7, 2017

Top 95 university construction firms

Turner Construction Co., The Whiting-Turner Contracting Co., and Barton Malow top BD+C’s ranking of the nation’s largest university sector contractor and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Sep 7, 2017

Mashup in the halls of ivy: Campus expansions put the emphasis on elevating the student experience

Today’s multi-functional buildings support a diverse range of academic programs, with transparent walls to foster interdisciplinary collaboration.

University Buildings | Sep 5, 2017

Rohrer College of Business supports the schools academic programs with several key spaces

Designed by KSS Architects and Goody Clancy, the new facility opened prior to the fall 2017 school year.

University Buildings | Sep 1, 2017

The University of Texas receives boutique-style student housing complex

The Ruckus Lofts provide 46 furnished units and 165 beds for UT students.

Libraries | Aug 30, 2017

1850s library building is brought into the 21st century

The original building was updated and given a new extension and landscaping.

University Buildings | Aug 28, 2017

Just what the doctor ordered: St. Louis College of Pharmacy receives new student center

The $50 million building adds over 193,000 sf of space to the campus.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021