flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Engineering Innovation Hub completes on SUNY New Paltz campus

University Buildings

Engineering Innovation Hub completes on SUNY New Paltz campus

Urbahn Architects designed the project.


By David Malone, Associate Editor | September 23, 2019
SUNY New Paltz EIH

Photo by Ola Wilk/Wilk Marketing Communications

The State University of New York (SUNY) at New Paltz’s new Engineering Innovation Hub (EIH) has recently completed construction. 

Designed by Urbahn Architects, the two-story EIH was built on a former parking lot on SUNY New Paltz’s main campus. It was designed to allow for a potential expansion to the east if the program requires more space in the future. 

The $13.5million, 19,500-sf building houses the College’s bachelor’s degree program in mechanical engineering, teaching and research lab spaces, 3D print prototyping labs, and the school’s Hudson Valley Additive Manufacturing Center (HVAMC). 

 

EIH lobbyPhoto by Ola Wilk/Wilk Marketing Communications.

 

The HVAMC’s collection of 3D printers are some of the most advanced technology at any academic laboratory in the United States, according to the university. SUNY is the first institution of higher education in the country to be designated a Stratasys-MakerBot Additive Research & Teaching (or SMART) lab by Stratasys, a 3D printing hardware and systems company.

See Also: St. Louis Community College Center for Nursing and Health Sciences opens to students

 

EIH teaching labPhoto by Ola Wilk/Wilk Marketing Communications.

 

The building welcomes students via a 661-sf entrance lobby designed to foster collaboration. It features display cabinets for 3D-printed artifacts, counters with computer charging and data outlets, lounge-style seating, and whiteboards. The building’s first floor also features seating niches within the hallways along the windows that integrate with benches, data access, and charging stations. A 1,900-sf teaching lab includes polished-concrete floors and painted steel columns, beams, and a metal deck ceiling. The HVAMC space is located on the first floor across from the teaching lab. An 850-sf machine shop, mechanical and electrical rooms, and public bathrooms round out the first floor.

 

Photo by Ola Wilk/Wilk Marketing Communications.

 

The second floor is home to a smaller lounge/collaborative space at the end of its main corridor, eight faculty offices, an open office space, a 300-sf conference room, three research/teaching labs, and a 1,200-sf computer lab.

The EIH is centrally located on the SUNY campus and was designed to meet LEED Silver certification requirements.

Also on the Build Team: PC Construction (gc), Vanderweil Engineers (mechanical and electrical engineer), Leslie E. Robertson Associates (structural engineer) BET Engineering Consultants (civil engineer), and Edgewater Design (landscape designer).

 

Photo by Ola Wilk/Wilk Marketing Communications.

 

Mechanical engineering students perform a compressiontestPhoto courtesy of SUNY New Paltz.

Related Stories

University Buildings | Jan 19, 2018

A 360-degree classroom highlights Washington State University’s new academic innovation hub

The circle-in-the-round classroom can accommodate 275 students.

Game Changers | Jan 12, 2018

‘Kit of parts’ anchors university’s remake

Sasaki designs interchangeable spaces to support a major educational shift at Mexico’s largest university system.

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

Big Data | Jan 5, 2018

In the age of data-driven design, has POE’s time finally come?

At a time when research- and data-based methods are playing a larger role in architecture, there remains a surprisingly scant amount of post-occupancy research. But that’s starting to change.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Adaptive Reuse | Jan 4, 2018

Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house

The Packing House was originally built for the Santiago Orange Growers Association.

University Buildings | Dec 20, 2017

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021