flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.


By By Robert Cassidy | September 26, 2012

The November issue of Building Design+Construction will feature a “progress report on sustainable design and construction” with a look to the top projects in key green building categories – and how AEC firms are keeping on top of sustainability issues.

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

Please respond to Rob Cassidy, Editorial Director: rcassidy@sgcmail.com, or 847-391-1040. We need to hear from you by Friday, Oct. 5, 2012.

Tell us what your firm is doing in sustainability that’s fresh and innovative: Using propriety environmental software? Energy modeling? Strategic planning around sustainability? Advocacy? New “green” building materials? Renewables? Net-zero? Living Buildings? Performance measurement? Human/social benefit of green building? Meeting heightened client demands for sustainability? Overcoming cost or regulatory barriers? Going beyond “point counting”? Marketing green?

Send us press releases, photo/s or renderings (low-res), PDFs, etc. – about your firm’s recent green projects (last 12-18 months).Projects could fall into several areas: LEED (minimum Gold or Platinum), Green Globes, CHPS, Living Building Challenge, Zero/Net-Zero Energy/Water/Waste, etc. – for New Construction, Renovation, Existing Buildings, Commercial Interiors, etc.
We are particularly interested in projects in the following categories:

  • Healthcare Facilities (hospitals, EDs, MOBs, outpatient, specialty facilities)
  • K-12 Schools (public, private, charter, Pre-K too)
  • University Projects (residence halls, student unions, classroom buildings, S+T, etc.)
  • Office Buildings (new, reconstructed – major fitouts)
  • Reconstruction Projects (historic preservation, adaptive reuse, reconstruction with addition, major renovations and fitouts)
  • Hotel/Hospitality/Restaurant Projects
  • Retail Projects (mixed-use, malls, shopping centers, stores)
  • Government Buildings (Fed, State, Local)
  • Multifamily (rental apartment, condo, townhouse complex – no single-family)
  • Military Projects (base facilities, offices, base Xchange, etc.)
  • Data Centers and Mission-Critical Facilities
  • BIM/VDC/CAD-based Projects that are also sustainably designed (did BIM help?)

Who is the key “sustainability” expert at your firm? (Name, title, contact info)

Thanks, and we look forward to working with you on this exciting issue of BD+C! +

Related Stories

| Apr 25, 2014

A radiant barrier FAQ: Everything you wanted to know but were afraid to ask

There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT

| Apr 25, 2014

6 winners selected for the Architectural League Prize

The Architectural League Prize, created in 1981, "recognizes exemplary and provocative work by young practitioners and provides a public forum for the exchange of their ideas," according to The Architectural League. 

| Apr 24, 2014

Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum

LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.

| Apr 23, 2014

Ahead of the crowd: How architects can utilize crowdsourcing for project planning

Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.

| Apr 23, 2014

Developers change gears at Atlantic Yards after high-rise modular proves difficult

At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.

| Apr 23, 2014

Experimental bot transfers CAD plans onto construction sites

The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.

| Apr 23, 2014

Mean and Green: Top 10 green building projects for 2014 [slideshow]

The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.

| Apr 23, 2014

Architecture Billings Index dips in March

The March ABI score was 48.8, down sharply from a mark of 50.7 in February. This score reflects a decrease in design services.

Sponsored | | Apr 23, 2014

Ridgewood High satisfies privacy, daylight and code requirements with fire rated glass

For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Norridge, Ill., the design team specified SuperLite II-XL 60 in GPX Framing for its optical clarity, storefront-like appearance, and high STC ratings.

| Apr 22, 2014

Transit-friendly apartment building now under construction

The new $44 million community is situated on eight acres, directly adjacent to the local Park-n-Ride, and a quick walk from a nearby light rail station.

boombox1
boombox2
native1

More In Category




Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021