flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Duke’s new Chinese campus sits atop a manmade lake

University Buildings

Duke’s new Chinese campus sits atop a manmade lake

Gensler and LandDesign designed the project.


By David Malone, Associate Editor | July 3, 2019

All images courtesy LandDesign

As part of Duke University’s 200-acre global campus in Kunshan, China, the 30-acre first phase of Duke Kunshan University Campus includes five buildings that sit atop a manmade lake and are interconnected by low bridges and seasonal plazas.

The plazas are submerged underneath the water and are only revealed and usable during periods of low rainfall, which coincides with peak student attendance. A four-acre water ecosystem is the central landscape element of the new campus and includes a stormwater management system with point-source water filtration, roof gardens, rain gardens, living water gardens, greywater capture, and aquatic habitat creation.

 

 

"The entire water filtration system serves as an ecological education lab with a flowing water garden located at the end,” said Kevin Vogel, PE, Partner and Civil Engineer with LandDesign, in a release. "The design also addresses scalable energy alternatives to correspond with the American College & University President’s Climate Commitment for carbon neutrality.”

Primary gathering spaces feature movable benches, planters, and sculptures in order to accommodate large events, art installations, and social/learning space. Gensler is the project’s architect while LandDesign is handling landscape architecture and civil engineering duties.

 

 

Related Stories

University Buildings | May 15, 2018

South Dakota State University to receive new apartment and townhouse neighborhood

The units will house juniors, seniors, and graduate students.

Sports and Recreational Facilities | May 15, 2018

Is this the most environmentally sustainable arena in the country?

The university arena was designed by Architectural Resources Cambridge.

Art Galleries | Apr 23, 2018

VCU’s Institute for Contemporary Art officially opens

Steven Holl Architects designed the building.

University Buildings | Apr 19, 2018

University of Minnesota’s Pioneer Hall to receive $104.5 million renovation/addition

The original building was no longer functional for modern day purposes.

Energy-Efficient Design | Mar 20, 2018

University of Hawaii Maui College on pace to become first U.S. campus to generate 100% renewable energy on-site

The project is part of a partnership with Johnson Controls and Pacific Current that will also allow four UH community college campuses on Oahu to significantly reduce their fossil fuel consumption.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021