flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Duke’s Hollows Quad residence halls provide housing for 700 upperclassmen

University Buildings

Duke’s Hollows Quad residence halls provide housing for 700 upperclassmen

William Rawn Architects designed the project.


By David Malone, Associate Editor | October 10, 2019
Exterior of Hollows Quad

Photos: Jonathan Black

Hollows Quad residence halls, two adjacent buildings of six and seven stories connected by a portal, have completed construction (courtesy of Skanska) on Duke University’s West Campus in Durham, N.C. The dormitories offer suite-style accommodations for 703 students.

The $91 million project features 147 suites organized into 18 smaller groupings of 30 to 60 beds called houses. Each house includes multiple one- to five-bedroom suites. The suites are all equipped with one or two bathrooms, a living room, and a kitchenette. There are single and double room options and some of the rooms are accessible in compliance with the Americans with Disabilities Act, with space for a student’s attendant.

 

See Also: Temple University’s Charles Library includes a ‘BookBot’ storage and retrieval system

 

Both buildings also feature common lounges with full kitchens, dedicates study rooms, lights with vacancy sensors, windows coated with a clear film to reduce heat, and climate controlled elevator shafts to avoid temperature loss.

 

Hollows Quad lounge space

Related Stories

| Feb 5, 2013

8 eye-popping wood building projects

From 100-foot roof spans to novel reclaimed wood installations, the winners of the 2013 National Wood Design Awards push the envelope in wood design.

| Jan 29, 2013

Trinitas and Harrison Street Break Ground Near University of Kentucky

The 699-bed Collegiate on Angliana, with an anticipated opening date of August 2013, will serve students attending the University of Kentucky (UK).

| Jan 18, 2013

BLT Architects Selected to Complete New Project for Drexel University

The Dornsife Center for Neighborhood Partnerships is expected to open in 2014

| Jan 2, 2013

Trends Report: New facilities enhance the quality of campus life

Colleges and universities are building state-of-the-art student unions, dining halls, and other non-academic buildings to enrich the campus experience, boost enrollment, and stay competitive.

| Dec 9, 2012

AIA: Laboratory design, building for breakthrough science

To earn 1.0 AIA/CES learning units, study the article carefully and take the exam.

| Dec 6, 2012

Cornell University students finding solace on indoor library lawns

Potted plants and comfortable chairs are placed around the grass, encouraging students to lounge there during one of the most stressful times of the academic year.

| Nov 20, 2012

PC Construction completes Juniper Hall at Champlain College

Juniper Hall is on track for LEED Gold certification from the U.S. Green Building Council.

| Nov 13, 2012

Have colleges + universities gone too far with "Quality of Life" buildings?

We'd like your input - recent projects, photo/s, renderings, and expert insight - on an important article we're working on for our Jan 2013 issue

| Nov 11, 2012

Greenbuild 2012 Report: Higher Education

More and more colleges and universities see sustainainably designed buildings as a given

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021