flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

DLR Group’s design for the new Lansing Correctional Facility focuses on energy-efficiency

Government Buildings

DLR Group’s design for the new Lansing Correctional Facility focuses on energy-efficiency

JE Dunn will manage the design and construction of the Kansas-based facility.


By David Malone, Associate Editor | April 26, 2018
The new Lansing Correctional Facility

Courtesy CoreCivic

DLR Group, JE Dunn Construction, and CoreCivic are teaming up to design and build the Kansas Department of Corrections’ new facility at the Lansing Correctional Campus in Lansing, Kan.

The new 396,719-sf facility will focus on energy efficiency and sustainability. It will include an energy saving shell design with a top-of-the-line roofing system and highly insulated walls systems. Modern utility systems will also help with energy and cost savings. The design also includes advanced security systems (always good in a correctional facility), a local maintenance staff, and locksmiths.

 

See Also: Is this the world's most humane prison?

 

New housing units, additional inmate beds, new intake units, and associated support spaces are all part of the new design. There will also be new dedicated spaces for medical services, food services, spiritual life, staff support areas, and indoor and outdoor recreation areas. Ample site circulation and parking space will be provided, all with improved lighting.

The design-build process is expected to take 24 months to complete.

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 9, 2012

Shepley Bulfinch given IIDA Design award for Woodruff Library?

The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

Howard S. Turner 1911–2012

A founding member of the Turner Construction Co.

| May 2, 2012

Public housing can incorporate sustainable design

Sustainable design achievable without having to add significant cost; owner and residents reap benefits

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021