flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Designs for community-based workspace in Carlsbad unveiled

Designs for community-based workspace in Carlsbad unveiled

make will include the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. 


By Cruzan | August 27, 2014
Cruzan announced make, a 175,000-square-foot office redevelopment project on the coast of Carlsbad, Calif. Cruzan will usher this next generation of community-based, integrated workspace into existence in fall 2014.
 
Housed in an industrial warehouse that was formerly home to the wholesale floral trade, the existing building will be redesigned under the overarching theme of making, to inspire the formation of new ideas and products. make will take full advantage of its coastal location with interior workspace that will easily spill outside, outdoor work and meeting spaces, storage for surfboards and bikes, a café with outdoor seating, rotating food trucks and a cutting-edge, integrated fitness center. An outdoor amphitheater can be used by tenants to host special events and cultivate community.
 
“Our ability to make something is what sets us apart, and we wanted to capture that unique human trait throughout this community-oriented space,” said Dennis Cruzan, founding partner of Cruzan. “This will be a one-of-a-kind work experience, uniquely integrated with its surroundings and built to foster great work. Carlsbad is home to many innovative companies, and we look forward to building this dynamic environment that will allow people to excel at what they do, make and create.”
 
Cruzan and their project design team, which includes Rapt Studio and OJB Landscape Architects, are working to create harmony between the built and natural environments. An L-shaped breezeway will be cut out from the existing structure and open to the ocean on one end and to community space at the other, while maximizing natural light to tenant areas.
 
make will feature other forward-thinking design elements, including the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. A second shipping container will be converted into a central distribution point for a bike share service that fosters easy access to and from the beach and other neighborhood amenities. make will also run a dedicated shuttle, offering tenants transportation to and from local surf spots, nearby restaurants and the Carlsbad Poinsettia COASTER station.
 
“This space is designed to motivate and inspire people to make and create,” said Cruzan. “To craft this cohesive design experience, we set out to design real connections — between the ocean setting, the indoor space, the outdoor environment and the culture of making. We are excited for companies from a wide range of industries to benefit from this community-centered workspace design and distinctive location.”
 
All renderings courtesy of Cruzan.
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Related Stories

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

| May 11, 2012

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

What historic preservationists and energy-performance advocates can learn from each other.

| May 11, 2012

VFA to acquire Altus Group's Capital Planning division

Strategic move strengthens VFA's facilities capital planning market osition in North America.

| May 11, 2012

Betz promoted to senior vice president for McCarthy’s San Diego Office

He will oversee client relations, estimating, office operations and personnel as well as integration of the company’s scheduling, safety and contracts departments.

| May 11, 2012

CRSI appoints Brace chairman

Stevens also elected to board of directors and vice-chair.

| May 11, 2012

Dempster named to AIA College of Fellows

Altoon Partners’ technical and construction services leader honored for his contributions.

| May 11, 2012

AIA launches education and training portal

New portal to host Contract Documents training, education resources in one convenient place.

| May 10, 2012

Chapter 7 When Modern Becomes Historic: Preserving the Modernist Building Envelope

This AIA CES Discovery course explores the special reconstruction questions posed by Modern-era buildings.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021