flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Designs for community-based workspace in Carlsbad unveiled

Designs for community-based workspace in Carlsbad unveiled

make will include the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. 


By Cruzan | August 27, 2014
Cruzan announced make, a 175,000-square-foot office redevelopment project on the coast of Carlsbad, Calif. Cruzan will usher this next generation of community-based, integrated workspace into existence in fall 2014.
 
Housed in an industrial warehouse that was formerly home to the wholesale floral trade, the existing building will be redesigned under the overarching theme of making, to inspire the formation of new ideas and products. make will take full advantage of its coastal location with interior workspace that will easily spill outside, outdoor work and meeting spaces, storage for surfboards and bikes, a café with outdoor seating, rotating food trucks and a cutting-edge, integrated fitness center. An outdoor amphitheater can be used by tenants to host special events and cultivate community.
 
“Our ability to make something is what sets us apart, and we wanted to capture that unique human trait throughout this community-oriented space,” said Dennis Cruzan, founding partner of Cruzan. “This will be a one-of-a-kind work experience, uniquely integrated with its surroundings and built to foster great work. Carlsbad is home to many innovative companies, and we look forward to building this dynamic environment that will allow people to excel at what they do, make and create.”
 
Cruzan and their project design team, which includes Rapt Studio and OJB Landscape Architects, are working to create harmony between the built and natural environments. An L-shaped breezeway will be cut out from the existing structure and open to the ocean on one end and to community space at the other, while maximizing natural light to tenant areas.
 
make will feature other forward-thinking design elements, including the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. A second shipping container will be converted into a central distribution point for a bike share service that fosters easy access to and from the beach and other neighborhood amenities. make will also run a dedicated shuttle, offering tenants transportation to and from local surf spots, nearby restaurants and the Carlsbad Poinsettia COASTER station.
 
“This space is designed to motivate and inspire people to make and create,” said Cruzan. “To craft this cohesive design experience, we set out to design real connections — between the ocean setting, the indoor space, the outdoor environment and the culture of making. We are excited for companies from a wide range of industries to benefit from this community-centered workspace design and distinctive location.”
 
All renderings courtesy of Cruzan.
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Related Stories

| May 30, 2012

Hill International to manage construction of Al Risafa Stadium in Iraq

The three-year contract has an estimated value to Hill of approximately $3.3 million.

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 29, 2012

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.  

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021