flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design for new pavilion in Toronto includes a ‘peel-away’ façade

University Buildings

Design for new pavilion in Toronto includes a ‘peel-away’ façade

An architect's proposal for a renovation of the main office building at the Ontario College of Art and Design features a façade that fans out from the edges of the building, like it’s opening up to visitors. 


By John Caulfield, Senior Editor | July 2, 2015
Design for new pavilion in Toronto includes a ‘peel-away’ façade, Ontario, Bortolotto Architects, OCAD

Renderings courtesy Bortolotto Architects

OCAD U, formerly known as the Ontario College of Art and Design, wants the surrounding community to reimagine its main office building as an interactive gateway for its campus in Toronto.

To achieve that goal, the university commissioned a $6 million renovation for that 16,300-sf building, whose exterior will be shrouded with a diaphanous white veil of water-jet-cut aluminum panels on metal framing secured by structural steel outriggers.

The façade that Bortolotto Design Architect has proposed would fan out from the edges of the building, like it’s opening up to visitors. The veil will also provide street-level views of student artwork.

ArchDaily reports that the college’s Digital Media Research Lab is developing an app to read information from specific sections of the façade, so pedestrians will be able to learn about different local artists.

OCAD U is rebranding the building as The Rosalie Sharp Pavilion, named after benefactors Rosalie and Isadore Sharp, who donated $3 million of the project’s budget. The college is paying the rest. The office building’s interior space will be converted into a flexible-use, student-oriented facility that includes minimalist studios and rooms for meetings and events.

The Building Team on this renovation also includes Blackwell (SE), ENSO Systems (mechanical/electrical engineer), and Halsall Associates (sustainability consultant). The contractor has yet to be chosen, and the groundbreaking date still needs to be set.

Bortolotto reportedly came up with this patterned veil design by mapping data about Toronto’s artistic community in order to position OCAD U as the nucleus of that activity, and as a cross-disciplinary, collaborative institution.

“The pattern inscribed in the scrim is defined as the notion of OCAD U as densely embedded within the urban fabric of the city,” Tania Bortolotto, the firm’s president, told Daily Commercial News.

The Arch Daily report notes that the peel-away edges of the pavilion “gesture” toward the nearby Art Gallery of Ontario, designed by Frank Gehry; as well as the university’s Sharp Centre for Design, designed by aLL Design’s Will Alsop. 

 

Related Stories

| Apr 16, 2012

University of Michigan study seeks to create efficient building design

The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.

| Apr 16, 2012

UNT lab designed to study green energy technologies completed

Lab to test energy technologies and systems in order to achieve a net-zero consumption of energy.

| Apr 13, 2012

Goettsch Partners designs new music building for Northwestern

The showcase facility is the recital hall, an intimate, two-level space with undulating walls of wood that provide optimal acoustics and lead to the stage, as well as a 50-foot-high wall of cable-supported, double-skin glass

| Apr 11, 2012

C.W. Driver completes Rec Center on CSUN campus

The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.

| Mar 28, 2012

Holden Cancer Center opens at University of Iowa Hospitals and Clinics

The new cancer clinic provides a significant increase in patient space from the prior facility, which was located in an adjacent building.

| Mar 28, 2012

Tsoi/Kobis & Associates developing master plan for UT Southwestern Medical Center

Firm will spearhead strategies for transforming existing in-patient hospital into state-of-the-art ambulatory care facility.

| Mar 27, 2012

Groundbreaking held for Valencia College West Campus Building 10 in Orlando

Project led by design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.

| Mar 26, 2012

McCarthy tops off Math and Science Building at San Diego Mesa College

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.

| Mar 21, 2012

Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design

New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms. 

| Mar 20, 2012

Stanford’s Knight Management Center Awarded LEED Platinum

The 360,000-sf facility underscores what is taught in many of the school’s electives such as Environmental Entrepreneurship and Environmental Science for Managers and Policy Makers, as well as in core classes covering sustainability across the functions of business.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021