Washington, D.C. -- The Design-Build Institute of America (DBIA), the only organization that defines, teaches and promotes best practices in design-build, has released research indicating that design-build project delivery represents nearly 40 percent of total market share in the United States, based on dollar value at the end of 2012. This represents an eight percent growth increase since 2005. The geographic area with the highest design-build delivery market share is the Pacific region at 59 percent. In addition, research findings show the Military sector dominates design-build project delivery with an 81 percent market share.
In a study of 48,640 project specifications across nine building sectors and geographic regions, DBIA found commercial building was the second largest sector, followed by medical building for design-build project delivery in 2012. In addition, research fromDBIA reveals that market size, as defined as the potential share of design-build delivery according to dollar value, has doubled in the United States since 2005.
“The growth of design-build project delivery across geographic regions and building sectors throughout the United States exemplifies the cost and time efficiencies that can be achieved to benefit the owner, project team and surrounding communities,” says Lisa Washington, Executive Director/CEO, DBIA. “Design-build done right serves to advance our industry and our economy.”
A copy of the full report, “Design-Build Project Delivery Market Share and Market Size Report,” is available on DBIA’s web site. The report was compiled and analyzed by Reed Construction Data/RSMeans Market Intelligence in 2013, one of North America’s largest information providers to the design and construction industry.
Established in 1993, the Design-Build Institute of America (DBIA) is the only organization that defines, teaches and promotes best practices in design-build project delivery. Design-build is an integrated approach that delivers design and construction services under one contract with a single point of responsibility. Owners select design-build to achieve best value while meeting schedule, cost and quality goals. Learn more about design-build andDBIA’s certification and other programs at www.dbia.org.
Related Stories
| Apr 29, 2014
Big U in the Big Apple: New design to protect New York City's coastline
Bjarke Ingels' proposed design for the Rebuild by Design competition adapts a key design principle in ship building to improve urban flood protection.
| Apr 28, 2014
Welcome to the Hive: OVA designs wild shipping container hotel for competition
Hong Kong-based OVA envisions a shipping-container hotel, where rooms could be removed at will and designed by advertisers.
Smart Buildings | Apr 28, 2014
Cities Alive: Arup report examines latest trends in urban green spaces
From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.
| Apr 25, 2014
How the 'digital natives' will transform your Building Team
The newest generation to enter the workforce is like no other that has come before it. This cohort is the first to grow up with the Internet, mobile technologies, and an “always connected” lifestyle.
| Apr 25, 2014
A radiant barrier FAQ: Everything you wanted to know but were afraid to ask
There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT
| Apr 25, 2014
6 winners selected for the Architectural League Prize
The Architectural League Prize, created in 1981, "recognizes exemplary and provocative work by young practitioners and provides a public forum for the exchange of their ideas," according to The Architectural League.
| Apr 24, 2014
Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum
LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.
| Apr 23, 2014
Ahead of the crowd: How architects can utilize crowdsourcing for project planning
Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.
| Apr 23, 2014
Developers change gears at Atlantic Yards after high-rise modular proves difficult
At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.
| Apr 23, 2014
Experimental bot transfers CAD plans onto construction sites
The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.