flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Des Moines University begins construction on new 88-acre campus

University Buildings

Des Moines University begins construction on new 88-acre campus

RDG Planning & Design is the design firm.


By David Malone, Associate Editor | September 10, 2020
DMU new campus

All renderings courtesy DMU

Des Moines University has broken ground on its new campus on 88 acres in West Des Moines at 8025 Grand Avenue.

The campus will include flexible environments that allow for didactic, active-learning and small group work. Learning studios and laboratories will be technology-rich while simulated health care environments will reflect those of modern care facilities, providing learners with a safe environment in which to practice patient care.

 

DMU new campus

 

Wellness and recreation facilities will allow students, faculty, and staff to stay active and healthy. An integrated student clinic will provide access to care for students to maintain a well-balanced lifestyles and a private student counseling suite ensures students have access to mental health care. The campus will also feature a mix of open and enclosed collaboration spaces that converge in the heart of the campus.

 

See Also: Performance Hall at the Taipei Music Center opens in the Nangang District

 

The entire campus has also been designed with the ability to grow and evolve over time. Flexibility will allow the university to respond to future needs in health care and health care education.

 

DMU campus outdoor space

 

In addition to RDG Planning & Design, the build team also includes Turner Construction as the general contractor.

The campus is expected to open in 2023, just in time for the school’s 125th anniversary.

 

DMU interior space

 

DMU wellness space

 

DMU campus aerial

Related Stories

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

Big Data | Jan 5, 2018

In the age of data-driven design, has POE’s time finally come?

At a time when research- and data-based methods are playing a larger role in architecture, there remains a surprisingly scant amount of post-occupancy research. But that’s starting to change.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Adaptive Reuse | Jan 4, 2018

Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house

The Packing House was originally built for the Santiago Orange Growers Association.

University Buildings | Dec 20, 2017

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.

University Buildings | Dec 4, 2017

The University of Nebraska’s new College of Business building highlights entrepreneur alumni and corporate leaders

Numerous storytelling spaces and displays are located throughout the building.

Wood | Nov 30, 2017

The first large-scale mass timber residence hall in the U.S. is under construction at the University of Arkansas

Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN collaborated on the design.

University Buildings | Nov 28, 2017

FXFOWLE and CO Architects collaborate on Columbia University School of Nursing building

The building has a ‘collaboration ribbon’ that runs throughout the building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021