flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dassault Systèmes to distribute Gehry Technologies’ digital project

Dassault Systèmes to distribute Gehry Technologies’ digital project


May 16, 2011

VÉLIZY-VILLACOUBLAY, France – May 12, 2011 - Dassault Systèmes, a world leader in 3D and Product Lifecycle Management (PLM) solutions, and Gehry Technologies (GT), a technology and services provider to leading owners, developers, architects, engineers, general contractors, fabricators, and other building industry professionals worldwide, announced today that Gehry Technologies’ Digital Project products will be integrated into the Dassault Systèmes’ portfolio and distributed through Dassault Systèmes’ direct and indirect sales channels.

Digital Project is a suite of powerful 3D building information modeling (BIM) applications created by Gehry Technologies using Dassault Systèmes’ CATIA as a core modeling engine. Digital Project features design, engineering and project management in a comprehensive 3D environment specifically tailored to the architecture, engineering and construction industry. Since its inception in 2004 Digital Project has been used for some of the world’s emblematic structures, from commercial and institutional building projects to large scale infrastructure works. GT has successfully used Digital Project to address challenging design and project management issues on such landmark projects as the World Trade Center site, Beijing National Olympic Stadium, the Lincoln Center redevelopment, and the Burj Kalifa Tower, the world’s tallest building, to name a few.

This agreement allows for broader distribution of GT’s Digital Project and leads the way for Dassault Systèmes’ longer term diversification strategy to address this market while providing an opportunity for Gehry Technologies to focus on its new project delivery and Web service offerings. Leveraging advanced integrated digital design technologies, unique collaboration capabilities, deep knowledge of the industry, and dedicated services will enable construction customers to run multi-discipline parametric modeling regardless of the building project scale and complexity while allowing BIM implementations across the entire project team, including architects, structural engineers, MEP engineers, contractors and fabricators.

“Dassault Systèmes PLM solutions have been successfully deployed in manufacturing industries and we strongly believe that they can bring significant value in addressing the needs of construction companies, as demonstrated by leading construction customer projects in recent years,” said Etienne Droit, CEO, CATIA, Dassault Systèmes. “Digital Project has already proven its unique capacity to make the most complex projects in the world successful and we are thrilled to take this long-lasting partnership one step further by bringing advanced solutions specifically developed for the construction sector to our customers.”

“GT’s mission is to help architecture realize its highest ambitions: meeting the needs of clients and communities through aspiration designs that are delivered on time and on budget,” added Dennis Shelden, CTO, Gehry Technologies. “Digital Project, based on Dassault Systèmes’ CATIA, gives designers power of control, design, budget, and scheduling… We think that this agreement will accelerate the adoption of Digital Project within the construction world, enabling more innovative buildings and structures.”

About Gehry Technologies

Gehry Technologies (GT) provides design and project management technology and consulting services to leading owners, developers, architects, engineers, general contractors, fabricators, and other building industry professionals worldwide. GT solutions increase creativity and control; reduce project risks, costs, and completion times; and improve processes and decisions through collaboration, project visibility, and information access. Gehry Technologies is privately held, with offices in Los Angeles, New York, Paris, Mexico City, Abu Dhabi, Hong Kong, Shanghai, and Beijing.

About Dassault Systèmes

As a world leader in 3D and Product Lifecycle Management (PLM) solutions, Dassault Systèmes brings value to more than 130,000 customers in 80 countries. A pioneer in the 3D software market since 1981, Dassault Systèmes applications provide a 3D vision of the entire lifecycle of products from conception to maintenance to recycling. The Dassault Systèmes portfolio consists of CATIA for designing the virtual product  - DELMIA for virtual production - SIMULIA for virtual testing - ENOVIA for global collaborative lifecycle management, EXALEAD for search-based applications- SolidWorks for 3D mechanical design and 3DVIA for online 3D lifelike experiences.

Related Stories

| Nov 29, 2010

New Design Concepts for Elementary and Secondary Schools

Hard hit by the economy, new construction in the K-12 sector has slowed considerably over the past year. Yet innovation has continued, along with renovations and expansions. Today, Building Teams are showing a keener focus on sustainable design, as well as ways to improve indoor environmental quality (IEQ), daylighting, and low-maintenance finishes such as flooring.

| Nov 29, 2010

Renovating for Sustainability

Motivated by the prospect of increased property values, reduced utility bills, and an interest in jumping on the sustainability bandwagon, a noted upturn in green building upgrades is helping designers and real estate developers stay busy while waiting for the economy to recover. In fact, many of the larger property management outfits have set up teams to undertake projects seeking LEED for Existing Buildings: Operations & Maintenance (LEED-EBOM, also referred to as LEED-EB), a certification by the U.S. Green Building Council.

| Nov 23, 2010

The George W. Bush Presidential Center, which will house the former president’s library

The George W. Bush Presidential Center, which will house the former president’s library and museum, plus the Bush Institute, is aiming for LEED Platinum. The 226,565-sf center, located at Southern Methodist University, in Dallas, was designed by architect Robert A.M. Stern and landscape architect Michael Van Valkenburgh.

| Nov 23, 2010

Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy

Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.

| Nov 16, 2010

Architecture Billings Index: inquiries for new projects remain extremely high

The new projects inquiry index was 61.7, down slightly from a nearly three-year high mark of 62.3 in September, according to the Architecture Billings Index (ABI). However, the ABI dropped nearly two points in October; the October ABI score was 48.7, down from a reading of 50.4 the previous month. The ABI reflects the approximate nine to 12 month lag time between architecture billings and construction spending.

| Nov 16, 2010

Brazil Olympics spurring green construction

Brazil's green building industry will expand in the coming years, spurred by construction of low-impact venues being built for the 2016 Olympics. The International Olympic Committee requires arenas built for the 2016 games in Rio de Janeiro meet international standards for low-carbon emissions and energy efficiency. This has boosted local interest in developing real estate with lower environmental impact than existing buildings. The timing couldn’t be better: the Brazilian government is just beginning its long-term infrastructure expansion program.

| Nov 16, 2010

Green building market grows 50% in two years; Green Outlook 2011 report

The U.S. green building market is up 50% from 2008 to 2010—from $42 billion to $55 billion-$71 billion, according to McGraw-Hill Construction's Green Outlook 2011: Green Trends Driving Growth report. Today, a third of all new nonresidential construction is green; in five years, nonresidential green building activity is expected to triple, representing $120 billion to $145 billion in new construction.

| Nov 16, 2010

Calculating office building performance? Yep, there’s an app for that

123 Zero build is a free tool for calculating the performance of a market-ready carbon-neutral office building design. The app estimates the discounted payback for constructing a zero emissions office building in any U.S. location, including the investment needed for photovoltaics to offset annual carbon emissions, payback calculations, estimated first costs for a highly energy efficient building, photovoltaic costs, discount rates, and user-specified fuel escalation rates.

| Nov 16, 2010

CityCenter’s new Harmon Hotel targeted for demolition

MGM Resorts officials want to demolish the unopened 27-story Harmon Hotel—one of the main components of its brand new $8.5 billion CityCenter development in Las Vegas. In 2008, inspectors found structural work on the Harmon didn’t match building plans submitted to the county, with construction issues focused on improperly placed steel reinforcing bar. In January 2009, MGM scrapped the building’s 200 condo units on the upper floors and stopped the tower at 27 stories, focusing on the Harmon having just 400 hotel rooms. With the Lord Norman Foster-designed building mired in litigation, construction has since been halted on the interior, and the blue-glass tower is essentially a 27-story empty shell.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021