flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Codes and Standards

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Campus plans include photovoltaic arrays and geothermal ground source heat pumps.


By Peter Fabris, Contributing Editor | June 15, 2017

Pixabay Public Domain

Cornell Tech, under construction on Roosevelt Island in New York City, recently announced details of its plan to achieve Net Zero energy efficiency for The Bloomberg Center.

Designed by the architecture firm Morphosis, The Bloomberg Center is the first academic building to be constructed on the Cornell Tech campus. The first phase of this development will open this September.

The campus plans include photovoltaic arrays, geothermal ground source heat pumps, an energy-efficient facade balancing the ratio between transparency and opaqueness to maximize building insulation and decrease energy demand, and smart building features that will monitor lighting and plug load use. The strategy to achieve a low energy building is through a stepped approach, prioritizing reduction in energy demand through load reductions and maximizing passive and energy efficient design, as well as using renewable energy to power the building systems.

There are 80 closed-loop geothermal wells, each 400 feet deep, that were drilled below the main campus public open space. The ground-source heat pumps will be used with an active chilled-beam system.

An acre-sized photovoltaic array tops The Bloomberg Center and neighboring The Bridge building. The building designs incorporate the panels as an integral architectural feature. The array on The Bloomberg Center also provides building shading.

Related Stories

Codes and Standards | Jun 17, 2016

Feds publish framework for evaluating public-private partnerships

No single factor determines whether a project yields stronger benefit as a P3.  

AEC Tech | Jun 17, 2016

Driverless cars could soon start impacting commercial, retail project design

Offsite parking and more space for valet parking lines are among the foreseeable changes.

Codes and Standards | Jun 17, 2016

Bay State moves toward single BIM protocol on state projects

Massport’s guidelines a step forward for integrated BIM initiative.  

Multifamily Housing | Jun 14, 2016

San Francisco voters approve tougher affordability requirement on new housing development

Critics charge that the measure may backfire and actually reduce new affordable units.  

Concrete | Jun 13, 2016

American Concrete Institute releases new Guide to Shotcrete

Includes information on application procedures, testing.  

Healthcare Facilities | Jun 10, 2016

Top 10 health technology hazards include some influenced by space design

ECRI Institute’s annual list includes operational and workflow issues.  

Codes and Standards | Jun 9, 2016

Supreme Court ruling could aid developers on properties containing wetlands

Unanimous decision allows landowners to take regulatory decisions straight to court.

Green | Jun 8, 2016

TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1

The newly renovated 25,000-sf space achieved gold-level status.

Concrete | Jun 7, 2016

Concrete Institute publishes document providing concrete curing guidance

New curing monitoring techniques included.  

Energy | Jun 7, 2016

Energy modeling payback typically as short as one to two months

Energy modeling is a ‘no-brainer—like checking MPG on a car’

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021