flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Codes and Standards

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Campus plans include photovoltaic arrays and geothermal ground source heat pumps.


By Peter Fabris, Contributing Editor | June 15, 2017

Pixabay Public Domain

Cornell Tech, under construction on Roosevelt Island in New York City, recently announced details of its plan to achieve Net Zero energy efficiency for The Bloomberg Center.

Designed by the architecture firm Morphosis, The Bloomberg Center is the first academic building to be constructed on the Cornell Tech campus. The first phase of this development will open this September.

The campus plans include photovoltaic arrays, geothermal ground source heat pumps, an energy-efficient facade balancing the ratio between transparency and opaqueness to maximize building insulation and decrease energy demand, and smart building features that will monitor lighting and plug load use. The strategy to achieve a low energy building is through a stepped approach, prioritizing reduction in energy demand through load reductions and maximizing passive and energy efficient design, as well as using renewable energy to power the building systems.

There are 80 closed-loop geothermal wells, each 400 feet deep, that were drilled below the main campus public open space. The ground-source heat pumps will be used with an active chilled-beam system.

An acre-sized photovoltaic array tops The Bloomberg Center and neighboring The Bridge building. The building designs incorporate the panels as an integral architectural feature. The array on The Bloomberg Center also provides building shading.

Related Stories

Codes and Standards | Aug 22, 2016

Federal construction contractors propose reforms to federal project delivery

Industry leaders offer how procurement system could be improved.

Legislation | Aug 19, 2016

California lawmakers may take action to address contractor negligence

An assembly committee heard testimony on deadly balcony collapse that occurred last year.

Energy Efficiency | Aug 17, 2016

Investor Confidence Project aimed at raising trustworthiness on energy efficiency projects

The new initiative screens projects to see if they are investor-ready.

Standards | Aug 17, 2016

U.K.’S BREEAM green building standard enters U.S. market

The standard is touted as a cost-effective alternative to LEED.

Standards | Aug 16, 2016

Standard for conducting, reporting energy audits open for review

A joint ASHRAE/ACCA proposal seeks comments from industry professionals.

Legislation | Aug 10, 2016

Calif. bill would speed up environmental lawsuits on certain projects

A nine-month limit has been proposed for some $100 million-plus projects.

Resiliency | Aug 10, 2016

White House pushes for better finance strategies for disaster mitigation and resilience

The move highlights innovative insurance, mortgage, tax, and finance-based strategies.

Regulations | Aug 9, 2016

New trend eases parking requirements for U.S. cities

Transit-oriented development and affordable housing are spurring the movement. 

Regulations | Aug 8, 2016

EPA toughens rules to reduce formaldehyde exposure from composite wood products

Products will now have to be labeled as compliant to the new rules.

Regulations | Aug 5, 2016

Stop-work orders in New York City up sharply this year

The orders come after a rise in the number of deadly accidents that have occurred in the past few years.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021