flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors say 811 utility location system has significant flaws

Codes and Standards

Contractors say 811 utility location system has significant flaws

More than half of firms in survey report damages, near misses because lines were unmarked or marked incorrectly.


By Peter Fabris, Contributing Editor | November 22, 2021
Excavator

Courtesy Pixabay

The nation’s 811 utility location system is significantly flawed, according to a new survey of construction firms that perform underground excavation work.

The survey report, released by the Associated General Contractors of America, found that more than half of the responding firms reported damages and near misses because lines were unmarked or marked incorrectly. “Most contractors say that calling 811 often leads to inaccurate line marking and that utility firms are often very slow in coming out to locate and mark their underground lines,” according to an AGC news release.

Seventy-eight percent of firms who found weaknesses said the biggest problem is the lack of accurate utility locating by utility owners and operators. And 56% of firms with concerns about the 811 system said slow utility owner and operator response times are a significant weakness.

Many firms reported being unfairly blamed for damages even after contacting 811. The survey found that nearly two-thirds of contractors received a claim from a utility owner and operator for damage to a line the construction firm was not responsible for damaging.

“We need to fix the 811 system to make sure utility firms are doing their part to accurately mark their lines,” said Stephen E. Sandherr, AGC CEO. “Too few utility firms are being held accountable for doing their part when it comes to helping contractors avoid hitting underground lines.”
 

Related Stories

| Jul 31, 2014

Cambridge, Mass., is latest locale to require energy usage disclosure

The City Council of Cambridge, Mass., approved the Building Energy Usage and Disclosure Ordinance (BEUDO) that requires benchmarking and disclosure of building energy performance for large commercial, institutional, and multifamily buildings.

| Jul 31, 2014

Stalled $1.5 billion Miami mixed-use redevelopment project advances

A long-delayed $1.5 billion mixed-use development in Miami moved ahead after city planners approved the project’s first phase.

| Jul 30, 2014

USGS updates National Seismic Hazard Maps

The U.S. Geological Service recently released an update of U.S. National Seismic Hazard Maps that reflect the latest analysis of where future earthquakes will occur, how frequently they may occur, and their strength.

| Jul 23, 2014

Fairfax County, Virginia toughens green standards

The Fairfax County Board of Supervisors recently strengthened its green building policy, requiring higher standards for residential, retail, office and other construction projects seeking approval for rezoning.

| Jul 23, 2014

Berkeley National Lab’s FLEXLAB is a test bed for energy efficient office design

FLEXLAB, short for the Facility for Low Energy Experiments, opened this summer at the Lawrence Berkeley National Laboratory.

| Jul 23, 2014

House passes 2015 GSA budget with 17% cut for new construction projects

The General Services Administration’s construction budget for fiscal year 2015 passed by the House this month includes cuts in both new construction and renovation/repairs compared to 2014.

| Jul 16, 2014

Coastal flooding increasing along East Coast, says report

An analysis of tidal levels and flood data by the news organization Reuters concludes that flooding has increased along the Eastern Seaboard over the past four decades.

| Jul 16, 2014

Local hiring requirement a tough challenge for new Detroit arena project

An agreement for a land transfer from the City of Detroit to Ilitch Holdings Inc., that enabled construction of a new arena for the Detroit Red Wings requires that 51% of the project’s construction workers must come from the city.

| Jul 16, 2014

Local hiring requirement a tough challenge for new Detroit arena project

An agreement for a land transfer from the City of Detroit to Ilitch Holdings Inc., that enabled construction of a new arena for the Detroit Red Wings requires that 51% of the project’s construction workers must come from the city.

| Jul 16, 2014

Massive $6.5 billion Silicon Valley development gets key city approval

The Santa Clara (Calif.) City Council approved the next steps for a massive development project next to Levi’s Stadium, the new home of the San Francisco 49ers.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021