flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors say 811 utility location system has significant flaws

Codes and Standards

Contractors say 811 utility location system has significant flaws

More than half of firms in survey report damages, near misses because lines were unmarked or marked incorrectly.


By Peter Fabris, Contributing Editor | November 22, 2021
Excavator

Courtesy Pixabay

The nation’s 811 utility location system is significantly flawed, according to a new survey of construction firms that perform underground excavation work.

The survey report, released by the Associated General Contractors of America, found that more than half of the responding firms reported damages and near misses because lines were unmarked or marked incorrectly. “Most contractors say that calling 811 often leads to inaccurate line marking and that utility firms are often very slow in coming out to locate and mark their underground lines,” according to an AGC news release.

Seventy-eight percent of firms who found weaknesses said the biggest problem is the lack of accurate utility locating by utility owners and operators. And 56% of firms with concerns about the 811 system said slow utility owner and operator response times are a significant weakness.

Many firms reported being unfairly blamed for damages even after contacting 811. The survey found that nearly two-thirds of contractors received a claim from a utility owner and operator for damage to a line the construction firm was not responsible for damaging.

“We need to fix the 811 system to make sure utility firms are doing their part to accurately mark their lines,” said Stephen E. Sandherr, AGC CEO. “Too few utility firms are being held accountable for doing their part when it comes to helping contractors avoid hitting underground lines.”
 

Related Stories

| Sep 18, 2014

Master Painter Institute approves 55 new paint products

The Master Painter Institute has issued approvals for 55 new paint products.

| Sep 18, 2014

OSHA announces new requirements for reporting deaths and severe injuries

The U.S. Department of Labor's Occupational Safety and Health Administration announced a final rule requiring employers to notify OSHA when an employee is killed on the job or suffers a work-related hospitalization, amputation, or loss of an eye.

| Sep 18, 2014

Eugene, Ore., passes ordinance to achieve steep energy consumption reductions

The Eugene, Ore., City Council recently passed an ordinance aimed at steeply reducing energy consumption and greenhouse gas emissions.

| Sep 10, 2014

Nine out of 10 New York City building plans fail energy code test

Earlier this year, New York City's Department of Buildings began auditing thousands of architectural plans for new and renovated office and residential buildings.

| Sep 10, 2014

AIA, CSI, and NIBS publish updated national CAD standard, includes new BIM module

The NCS helps architects, constructors and operators coordinate efforts by classifying electronic design data consistently and making information retrieval easier, the industry groups say. 

| Sep 10, 2014

Perry named new director of OSHA’s Standards and Guidance Directorate

Bill Perry has been named new director of the OSHA’s Directorate of Standards and Guidance, effective Aug. 24, 2014.

| Sep 10, 2014

ASHRAE proposes verification for energy standard

The ASHRAE/IES energy standard would have multiple compliance options to ensure verification of delivered building envelope performance under a new proposal.

| Sep 2, 2014

Micro-apartment concept can’t get traction in Boston suburb

Micro-apartments are gaining acceptance in nearby Boston and in places such as San Francisco and New York, but Weymouth, Mass., officials and neighbors were not receptive to a proposal for tiny dwellings this summer.

| Sep 2, 2014

Montreal borough leader urges city to issue green roof guidelines

The mayor of Montreal's Saint-Laurent borough wants Quebec's housing authority to speed up its plan to publish construction guidelines for green roofs.

| Sep 2, 2014

Proposed federal rules would create more stringent healthcare facility safety rules

A key change is a requirement that buildings over 75 feet tall have sprinkler systems throughout the structure. Existing buildings would have 12 years to install them.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021