Minneapolis achieved a construction milestone in 2014, when for the first time it issued $2 billion in new building permits in a single year.
The Star Tribune reports that two major projects—a new stadium for the Minnesota Vikings NFL team and the city’s Downtown East redevelopment—accounted for about half of the total worth of the permits issued. About one third of the total permits issued were for more than 2,000 housing units, the vast majority of which will be multifamily dwellings.
More than 65% of the new permits were issued for projects in Minneapolis’s Ward 3, which encompasses the North Loop, Downtown East, the downtown riverfront, and northeast Minneapolis.
Doug Kress, the city’s director of development services, told the Star Tribune that the stadium project has sparked development in the surrounding areas. “There’s a lot of growth in Minneapolis in both downtown and our neighborhoods,” he’s quoted as saying. (Minneapolis ranks 16th as a metropolitan region in population in the U.S., with 3.42 million residents.)
This metro is looking for permit growth to continue in 2015. The Star Tribune reports that at least 10 projects around the city have received land-use approval. And portions of the Vikings stadium and Downtown East projects have yet to be permitted.
Mayor Betsy Hodges believes the permitting activity is evidence of a vote of confidence that investors, workers, business owners, and residents are giving to the city’s future. “I look forward to building on this momentum as we continue to attract new residences, businesses, and investment,” she told the Star Tribune.
Related Stories
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.
| Dec 9, 2011
BEST AEC FIRM 2011: Chapman Construction/Design
Taking sustainable practices to heart.
| Dec 9, 2011
BEST AEC FIRMS 2011: EYP Architecture & Engineering
Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.