flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction permits exceeded $2 billion in Minneapolis in 2014

Construction permits exceeded $2 billion in Minneapolis in 2014

Two major projects are driving commercial and residential building activity. 


By John Caulfield, Senior Editor | January 6, 2015
Photo: Jdkoenig via Wikimedia Commons
Photo: Jdkoenig via Wikimedia Commons

Minneapolis achieved a construction milestone in 2014, when for the first time it issued $2 billion in new building permits in a single year. 

The Star Tribune reports that two major projects—a new stadium for the Minnesota Vikings NFL team and the city’s Downtown East redevelopment—accounted for about half of the total worth of the permits issued. About one third of the total permits issued were for more than 2,000 housing units, the vast majority of which will be multifamily dwellings. 

More than 65% of the new permits were issued for projects in Minneapolis’s Ward 3, which encompasses the North Loop, Downtown East, the downtown riverfront, and northeast Minneapolis. 

Doug Kress, the city’s director of development services, told the Star Tribune that the stadium project has sparked development in the surrounding areas. “There’s a lot of growth in Minneapolis in both downtown and our neighborhoods,” he’s quoted as saying. (Minneapolis ranks 16th as a metropolitan region in population in the U.S., with 3.42 million residents.)

This metro is looking for permit growth to continue in 2015. The Star Tribune reports that at least 10 projects around the city have received land-use approval. And portions of the Vikings stadium and Downtown East projects have yet to be permitted. 

Mayor Betsy Hodges believes the permitting activity is evidence of a vote of confidence that investors, workers, business owners, and residents are giving to the city’s future. “I look forward to building on this momentum as we continue to attract new residences, businesses, and investment,” she told the Star Tribune.

Related Stories

| Dec 20, 2011

Third annual Gingerbread Build-off winners announced

Nine awards were handed out acknowledging the most unique and creative gingerbread structures completed.

| Dec 20, 2011

BCA’s Best Practices in New Construction available online

This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.

| Dec 20, 2011

Aragon Construction leading build-out of foursquare office

The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.

| Dec 20, 2011

HOAR Construction opens Austin, Texas office

Major projects in central Texas spur firm’s growth.

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 19, 2011

Summit Design+Build selected as GC for Chicago recon project

The 130,000 square foot building is being completely renovated.

| Dec 19, 2011

USGBC welcomes new board directors?

Board responsible for articulating and upholding the vision, values, mission of organization.

| Dec 19, 2011

Davis Construction breaks ground on new NIAID property

The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each. 

| Dec 19, 2011

Survey: Job growth driving demand for office and industrial real estate in Southern California

Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021