flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction on Orlando’s massive ‘innovation hub’ is finally starting

Mixed-Use

Construction on Orlando’s massive ‘innovation hub’ is finally starting

The $1 billion Creative Village development will create a business and education hub.


By John Caulfield, Senior Editor | May 10, 2015
Construction on Orlando’s massive ‘innovation hub’ is finally starting

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. Rendering courtesy Creative Village Development 

The 68-acre, $1 billion Creative Village project in downtown Orlando, the largest transit-oriented project in central Florida, is expected to break ground on May 14.

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. The Orlando Business Journal reports that the University of Central Florida has committed to anchor the Village with a $207 million downtown campus that would create 4,000 jobs. UCF has stated its intention to bring 6,000 students downtown.

Creative Village is a public/private partnership between the City of Orlando and the Master Developer, Creative Village Development; a joint venture between Banc of America Community Development Corporation, and a local developer-investment team lead by Ustler Development. Baker Barrios Architects, the project’s design architect; and Emerge Real Estate Ventures, are part of that group.

The city’s Amway Arena was demolished in 2012 to make way for Creative Village. That demolition’s debris—including 94 million pounds of concrete and 13 million pounds of steel—was recycled and/or sorted for future reuse to build Creative Village’s infrastructure.

The development expected to take 15 to 20 years to complete, and include when finished 1.2 million sf of office and creative space, 500,000 sf of education space, 1,500 housing units, and 225 hotel rooms. A PS-8 school is planned nearby. Construction will create 6,500 jobs, and the Village would offer 5,000 permanent jobs. The Building Team estimates that Creative Village would also generate between $800 million and $1 billion in new development.

Road and utility work in Phase 1 would accommodate the expansion of the Lynz Lymmo bus circulator system to Orlando’s west side, near the Parramore District. Craig Ustler, MAI, CCIM, president of Ustler Development, said that about $13 million in infrastructure work on the bus route and the building paths is already taking shape.

Vertical construction is scheduled to begin in later 2015 or early 2016.

Related Stories

Mixed-Use | Apr 25, 2017

Dutch building incorporates 22 emojis into its façade

The emoji building is part of a larger mixed-use development built around a 150-year-old oak tree.

Mixed-Use | Apr 24, 2017

Take a look at Brooklyn’s Domino Sugar Refinery redevelopment

The master plan features market-rate and affordable housing, mixed-use space, and a waterfront park with a 5-block long “Artifact Walk.”

Sports and Recreational Facilities | Apr 21, 2017

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

Mixed-Use | Apr 5, 2017

SOM-designed ‘vertical village’ is Thailand’s largest private-sector development ever

60,000 people will live and work in One Bangkok when it is completed in 2025.

Urban Planning | Mar 31, 2017

4 important things to consider when designing streets for people, not just cars

For the most part what you see is streets that have been designed with the car in mind—at a large scale for a fast speed.

High-rise Construction | Mar 31, 2017

Ping An Finance Center officially becomes the fourth tallest building in the world

The completed building sits between the Makkah Royal Clock Tower at 1,972 feet and One World Trade Center at 1,776 feet.

Mixed-Use | Mar 27, 2017

The Plant brings terrace-to-table living to Toronto

Curated Properties and Windmill Developments have teamed up to create a mixed-use building with food as the crux of the project.

Mixed-Use | Mar 21, 2017

Studio Gang commissioned to design its first Canadian building

The project will be a mixed-use tower at the southwest corner of Yonge and Delisle in Toronto.

Retail Centers | Mar 9, 2017

When everyone shops online, what happens to mixed-use retail?

NBBJ’s David Yuan explains how changing retail trends are creating new opportunities for urban experiences and public space. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021