The construction materials price index for nonresidential buildings fell 0.3% in April extending the decline since the September index peak to 13.1%. Prices for the mix of materials used in nonresidential construction prices are back to the December 2007 level before the 14% jump in prices from March through September.
The materials price index is expected to decline slowly for a few more months but be rising modestly again by the end of the year and rising more quickly next year, perhaps up 4–5% from the 2009 average.
April's price drop was led by structural steel (7.3%) and plywood (-3.3%). The only significant April price increases were for diesel (20.5%) and nonferrous pipe and tube (20.9%) which had both declined in March. Rising scrap and ore prices mean rising nonferrous product prices for at least several months. The Energy Department reports that diesel pump prices were unchanged from the April to the May price survey week.
Percent Change in ..... | 1 month | 3 months | 12 months | 3 years |
Source: Producer Price Index. Bureau of Labor Statistics | ||||
Construction commodities | ||||
Cement | 0.8 | -0.2 | 0.0 | 6.1 |
Construction sand, gravel & crushed stone | 0.5 | 1.4 | 5.5 | 23.1 |
Softwood plywood | -3.3 | -4.9 | -12.7 | -21.1 |
Softwood lumber | 1.6 | -2.6 | -10.7 | -32.5 |
Manufactured materials | ||||
Gypsum products | -0.2 | -1.2 | 5.3 | -17.5 |
Diesel fuel | 20.5 | -2.6 | -56.2 | -30.6 |
Paint | 0.1 | 0.1 | 12.4 | 22.5 |
Plastic construction products | -0.5 | -0.6 | 3.0 | 1.9 |
Vitreous plumbing fixtures | 2.3 | 2.4 | 4.2 | -1.9 |
Ceramic tile | -2.0 | -1.4 | -0.2 | 1.6 |
Flat glass | -0.4 | -1.0 | 2.9 | 2.7 |
Hot-rolled bars, plates, and structural shapes | -7.3 | -15.7 | -25.9 | -2.0 |
Extruded aluminum rod, bar, and other shapes | 1.2 | -4.3 | -26.3 | -18.2 |
Architectural metalwork | 0.6 | -2.4 | 12.1 | 24.7 |
Metal plumbing fixtures | 0.5 | 0.2 | 2.2 | 13.1 |
Builders' hardware | 0.5 | -2.7 | 6.8 | 20.4 |
Sheet metal products | -0.6 | -3.6 | 0.2 | 9.9 |
Nonferrous pipe and tube | 20.9 | 26.7 | -28.5 | -1.3 |
Building brick | 0.5 | -0.2 | 0.1 | 0.8 |
Ready-mix concrete | -1.0 | -1.9 | 3.4 | 10.7 |
Concrete block and brick | 0.3 | -0.1 | 3.3 | 10.1 |
Millwork (window, door, cabinet) | -0.2 | 0.7 | 1.7 | 5.3 |
Engineered wood products | -1.3 | -3.3 | -2.6 | -14.6 |
Metal doors, sash, and trim | -0.8 | 0.2 | 5.4 | 9.2 |
Summary | ||||
Construction materials (commodity level) | -2.3 | -3.1 | -1.7 | 4.9 |
Inputs to construction industries | -0.4 | -1.6 | -3.6 | 6.4 |
Inputs to nonresidential construction | -0.3 | -1.6 | -5.2 | 6.3 |
Related Stories
| Jan 4, 2011
Product of the Week: Zinc cladding helps border crossing blend in with surroundings
Zinc panels provide natural-looking, durable cladding for an administrative building and toll canopies at the newly expanded Queenstown Plaza U.S.-Canada border crossing at the Niagara Gorge. Toronto’s Moriyama & Teshima Architects chose the zinc alloy panels for their ability to blend with the structures’ scenic surroundings, as well as for their low maintenance and sustainable qualities. The structures incorporate 14,000 sf of Rheinzink’s branded Angled Standing Seam and Reveal Panels in graphite gray.
| Jan 4, 2011
Furniture Sustainability Standard - Approved by ANSI and Released for Distribution
BIFMA International recently announced formal American National Standards Institute (ANSI) approval and release of the ANSI/BIFMA e3-2010 Furniture Sustainability Standard. The e3 standard represents a structured methodology to evaluate the "sustainable" attributes of furniture products and constitutes the technical criteria of the level product certification program.
| Dec 7, 2010
Product of the Week: Petersen Aluminum’s column covers used in IBM’S new offices
IBM’s new offices at Dulles Station West in Herndon, Va., utilized Petersen’s PAC-1000 F Flush Series column covers. The columns are within the office’s Mobility Area, which is designed for a mobile workforce looking for quick in-and-out work space. The majority of workspaces in the office are unassigned and intended to be used on a temporary basis.
| Nov 2, 2010
A Look Back at the Navy’s First LEED Gold
Building Design+Construction takes a retrospective tour of a pace-setting LEED project.
| Nov 2, 2010
Wind Power, Windy City-style
Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
HQ renovations aim for modern look
Gerner Kronick + Valcarcel Architects’ renovations to the Commonwealth Bank of Australia’s New York City headquarters will feature a reworked reception lobby with back-painted glass, silk-screened logos, and a video wall.
| Oct 13, 2010
Community center under way in NYC seeks LEED Platinum
A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.