The construction materials price index for nonresidential buildings fell 0.3% in April extending the decline since the September index peak to 13.1%. Prices for the mix of materials used in nonresidential construction prices are back to the December 2007 level before the 14% jump in prices from March through September.
The materials price index is expected to decline slowly for a few more months but be rising modestly again by the end of the year and rising more quickly next year, perhaps up 4–5% from the 2009 average.
April's price drop was led by structural steel (7.3%) and plywood (-3.3%). The only significant April price increases were for diesel (20.5%) and nonferrous pipe and tube (20.9%) which had both declined in March. Rising scrap and ore prices mean rising nonferrous product prices for at least several months. The Energy Department reports that diesel pump prices were unchanged from the April to the May price survey week.
Percent Change in ..... | 1 month | 3 months | 12 months | 3 years |
Source: Producer Price Index. Bureau of Labor Statistics | ||||
Construction commodities | ||||
Cement | 0.8 | -0.2 | 0.0 | 6.1 |
Construction sand, gravel & crushed stone | 0.5 | 1.4 | 5.5 | 23.1 |
Softwood plywood | -3.3 | -4.9 | -12.7 | -21.1 |
Softwood lumber | 1.6 | -2.6 | -10.7 | -32.5 |
Manufactured materials | ||||
Gypsum products | -0.2 | -1.2 | 5.3 | -17.5 |
Diesel fuel | 20.5 | -2.6 | -56.2 | -30.6 |
Paint | 0.1 | 0.1 | 12.4 | 22.5 |
Plastic construction products | -0.5 | -0.6 | 3.0 | 1.9 |
Vitreous plumbing fixtures | 2.3 | 2.4 | 4.2 | -1.9 |
Ceramic tile | -2.0 | -1.4 | -0.2 | 1.6 |
Flat glass | -0.4 | -1.0 | 2.9 | 2.7 |
Hot-rolled bars, plates, and structural shapes | -7.3 | -15.7 | -25.9 | -2.0 |
Extruded aluminum rod, bar, and other shapes | 1.2 | -4.3 | -26.3 | -18.2 |
Architectural metalwork | 0.6 | -2.4 | 12.1 | 24.7 |
Metal plumbing fixtures | 0.5 | 0.2 | 2.2 | 13.1 |
Builders' hardware | 0.5 | -2.7 | 6.8 | 20.4 |
Sheet metal products | -0.6 | -3.6 | 0.2 | 9.9 |
Nonferrous pipe and tube | 20.9 | 26.7 | -28.5 | -1.3 |
Building brick | 0.5 | -0.2 | 0.1 | 0.8 |
Ready-mix concrete | -1.0 | -1.9 | 3.4 | 10.7 |
Concrete block and brick | 0.3 | -0.1 | 3.3 | 10.1 |
Millwork (window, door, cabinet) | -0.2 | 0.7 | 1.7 | 5.3 |
Engineered wood products | -1.3 | -3.3 | -2.6 | -14.6 |
Metal doors, sash, and trim | -0.8 | 0.2 | 5.4 | 9.2 |
Summary | ||||
Construction materials (commodity level) | -2.3 | -3.1 | -1.7 | 4.9 |
Inputs to construction industries | -0.4 | -1.6 | -3.6 | 6.4 |
Inputs to nonresidential construction | -0.3 | -1.6 | -5.2 | 6.3 |
Related Stories
| Dec 7, 2011
Autodesk agrees to acquire Horizontal Systems
Acquisition extends and accelerates cloud-based BIM solutions for collaboration, data, and lifecycle management.
| Dec 5, 2011
New York and San Francisco receive World Green Building Council's Government Leadership Awards
USGBC commends two U.S. cities for their innovation in green building leadership.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Dec 5, 2011
Fraser Brown MacKenna wins Green Gown Award
Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Dec 2, 2011
Legrand joins White House initiative to spur energy efficiency in commercial buildings
Company agrees to aggressive energy savings and reporting.
| Dec 1, 2011
Nauset Construction breaks ground on Massachusetts health care center
The $20 million project is scheduled to be completed by December 2012.
| Dec 1, 2011
Ground broken on first LEED Platinum designed school house built by volunteers
Phoenix public school receives the generous gift of a state-of-the-art building for student and community use.
| Dec 1, 2011
VLK Architects’ office receives LEED certification
The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.
| Nov 29, 2011
First EPD awarded to exterior roof and wall products manufacturer
EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact.