flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on Phase I of $240 million mixed-use development in Boston

Mixed-Use

Construction begins on Phase I of $240 million mixed-use development in Boston

Fenway Center will span 4.5 acres between Brookline, Beacon Street, David Ortiz Way, and the Massachusetts Turnpike.


By David Malone, Associate Editor | December 12, 2017
Fenway Center from the East

Rendering courtesy of Fenway Center Development

Fenway Center, Boston’s newest mixed-use development, is now under construction adjacent to Fenway Park.

Fenway Center Development LLC, the project’s developer, announced joint venture partners Gerding Edlen, TH Real Estate, and Meredith Management have signed a long-term ground lease with the Massachusetts Department of Transportation for Phase I of Fenway Center.

 

Aerial view of Fenway Center westRendering courtesy of Fenway Center Development.

 

Phase I of the new mixed-use development will take two years to complete and will comprise two residential apartment buildings with 312 units, 37,000 sf of ground floor retail, and 200 underground parking spaces. A 12,000-sf air rights deck and landscaped pedestrian walkway over Yawkey Station and between Beacon St. and Yawkey Station is also included.

Fenway Center will replace a large surface parking lot. It’s buildings are arranged so the taller ones are located next to Yawkey Station to serve as an architectural marker and gateway, while the smaller buildings are scaled down in respect to the Audubon Circle neighborhood and Fenway park area.

 

View of Fenway Center from BeaconRendering courtesy of Fenway Center Development.

 

Phase I of Fenway Center is slated for completion by the beginning of 2020.

 

Fenway Center view westRendering courtesy of Fenway Center Development.

Tags

Related Stories

Hotel Facilities | Apr 13, 2015

Figure-eight shaped hotel to open around PyeongChang 2018 Winter Olympics Facility

Just three miles away from the Olympic stadiums, the hotel will be a hub of its own.

Mixed-Use | Apr 7, 2015

$100 billion 'city from scratch' taking shape in Saudi Arabia

The new King Abdullah Economic City was conceived to diversify the kingdom's oil-dependent economy by focusing more in its shipping industry.

High-rise Construction | Mar 24, 2015

Timber high-rise residential complex will tower over Stockholm waterfront

The four towers, 20 stories each, will be made entirely out of Swedish pine, from frame to façade.

Mixed-Use | Mar 13, 2015

Dubai announces mega waterfront development Aladdin City

Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.

High-rise Construction | Mar 11, 2015

Must see: Firm proposes skyscraper with a ‘twist’ in downtown Tulsa

Tulsa, Okla.-based architecture practice Kinslow, Keith & Todd released renderings of a skyscraper concept that takes the shape of a tornado.

Modular Building | Mar 10, 2015

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”

Transit Facilities | Mar 4, 2015

5+design looks to mountains for Chinese transport hub design

The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.

Sponsored | | Mar 3, 2015

New York’s Fulton Center relies on TGP for light-flooded, underground transit hub

Fire-rated curtain wall systems filled this subterranean hub with natural light.

Sponsored | Shopping Centers | Feb 26, 2015

A color-changing gateway for Altara Center

Valspar works with developers to complete a multicolored shopping center façade in Honduras.

Industrial Facilities | Feb 24, 2015

Starchitecture meets agriculture: OMA unveils design for Kentucky community farming facility

The $460 million Food Port project will define a new model for the relationship between consumer and producer.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021