flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on Phase I of $240 million mixed-use development in Boston

Mixed-Use

Construction begins on Phase I of $240 million mixed-use development in Boston

Fenway Center will span 4.5 acres between Brookline, Beacon Street, David Ortiz Way, and the Massachusetts Turnpike.


By David Malone, Associate Editor | December 12, 2017
Fenway Center from the East

Rendering courtesy of Fenway Center Development

Fenway Center, Boston’s newest mixed-use development, is now under construction adjacent to Fenway Park.

Fenway Center Development LLC, the project’s developer, announced joint venture partners Gerding Edlen, TH Real Estate, and Meredith Management have signed a long-term ground lease with the Massachusetts Department of Transportation for Phase I of Fenway Center.

 

Aerial view of Fenway Center westRendering courtesy of Fenway Center Development.

 

Phase I of the new mixed-use development will take two years to complete and will comprise two residential apartment buildings with 312 units, 37,000 sf of ground floor retail, and 200 underground parking spaces. A 12,000-sf air rights deck and landscaped pedestrian walkway over Yawkey Station and between Beacon St. and Yawkey Station is also included.

Fenway Center will replace a large surface parking lot. It’s buildings are arranged so the taller ones are located next to Yawkey Station to serve as an architectural marker and gateway, while the smaller buildings are scaled down in respect to the Audubon Circle neighborhood and Fenway park area.

 

View of Fenway Center from BeaconRendering courtesy of Fenway Center Development.

 

Phase I of Fenway Center is slated for completion by the beginning of 2020.

 

Fenway Center view westRendering courtesy of Fenway Center Development.

Tags

Related Stories

Mixed-Use | Feb 22, 2016

Goettsch Partners and Lead 8 win design competition for Shanghai mixed-use complex

The designers stressed walkability and green space to attract visitors.

Mixed-Use | Feb 18, 2016

New renderings unveiled for Miami Worldcenter master plan

The ‘High Street’ retail promenade and plaza is one of the largest private master-planned projects in the U.S. and is set to break ground in early March.

Green | Feb 18, 2016

Best laid plans: Masdar City’s dreams of being the first net-zero city may have disappeared

The $22 billion experiment, to this point, has produced less than stellar results.

Mixed-Use | Jan 25, 2016

SOM unveils renderings of dual-tower Manhattan West development

The five million-sf project includes two office towers, a residential tower, retail space, and a new public square.

Mixed-Use | Jan 8, 2016

Aedas’ Shanghai project named the world’s best mixed-use architecture

Mapletree Business City Shanghai and VivoCity Shanghai took home a crown at the International Property Awards

High-rise Construction | Jan 7, 2016

Zaha Hadid designs a tower of 'stacked vases' in Melbourne

The structure is supported by sets of curved columns that taper to four different base heights.  

Mixed-Use | Dec 23, 2015

'Tree-covered mountains' planned for urban Shanghai

Heatherwick Studio unveiled a 300,000-sm mixed-use project in the Chinese city’s main arts district.

Mixed-Use | Nov 16, 2015

Italian architect designs vertical forest with prefab units by BuroHappold

Cantilevered planters will host cedar trees and other plants hundreds of feet above ground.

Multifamily Housing | Oct 7, 2015

BIG designs lush, terraced mixed-use building in Sweden

Cascading glass and wooden cubes create a form similar to Northern Ireland’s Giant’s Causeway rock formation.

Multifamily Housing | Oct 1, 2015

Wiel Arets unveils twin, 558-foot mixed-use towers in Bahrain’s capital

The development, Bahrain Bay Tower, will consist of two residential towers connected “by a plinth of retail, office, parking, and public park space.”

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021