flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The construction of the Atlanta Braves’ new stadium, in 1 minute

Sports and Recreational Facilities

The construction of the Atlanta Braves’ new stadium, in 1 minute

OxBlue’s time-lapse video draws from more than 200,000 images.


By John Caulfield, Senior Editor | March 9, 2017

SunTrust Park in Atlanta is racing toward its final stages of construction to be able to open on time for opening day for the Atlanta Braves' MLB baseball team. A newly released time-lapse video captures the last 21 months of construction in a flash. Image: hshin.ajc.com 

The opening of SunTrust Park, the Atlanta Braves’ new $622 million, 41,500-seat stadium, is only 35 days away from opening day of the Major League Baseball season.

The stadium, designed by Populous and being built by American Builders, had its official groundbreaking on September 16, 2014. Since May 2015, OxBlue Corp., a construction camera provider, has been documenting the construction of the stadium and its plaza, known as The Battery Atlanta, using one fixed-position and two pan-tilt-zoom cameras that were mounted outside and above the stadium. Three other cameras were mounted at different locations on the 15-acre jobsite.

OxBlue has released a 1 minute-6 second video that compresses 21 months of construction. It was produced using a selection of 203,616 images captured by the three cameras.

SunTrust Park will include the first full LED lighting system in a major league stadium, and a canopy that shades about 60% of its seats from the sun.

Click here as well to take a 360-degree tour of the stadium. (You can move the image to see different parts of the park.)

 

Related Stories

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Nov 1, 2011

Sasaki expands national sports design studio

Sasaki has also added Stephen Sefton to the sports design studio as senior associate. 

| Oct 20, 2011

UNT receives nation’s first LEED Platinum designation for collegiate stadium

Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.

| Sep 30, 2011

Design your own floor program

Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility. 

| Sep 16, 2011

Largest solar installation completed at Redskins' football stadium

On game days, solar power can provide up to 20% of FedExField’s power.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021