flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The construction of the Atlanta Braves’ new stadium, in 1 minute

Sports and Recreational Facilities

The construction of the Atlanta Braves’ new stadium, in 1 minute

OxBlue’s time-lapse video draws from more than 200,000 images.


By John Caulfield, Senior Editor | March 9, 2017

SunTrust Park in Atlanta is racing toward its final stages of construction to be able to open on time for opening day for the Atlanta Braves' MLB baseball team. A newly released time-lapse video captures the last 21 months of construction in a flash. Image: hshin.ajc.com 

The opening of SunTrust Park, the Atlanta Braves’ new $622 million, 41,500-seat stadium, is only 35 days away from opening day of the Major League Baseball season.

The stadium, designed by Populous and being built by American Builders, had its official groundbreaking on September 16, 2014. Since May 2015, OxBlue Corp., a construction camera provider, has been documenting the construction of the stadium and its plaza, known as The Battery Atlanta, using one fixed-position and two pan-tilt-zoom cameras that were mounted outside and above the stadium. Three other cameras were mounted at different locations on the 15-acre jobsite.

OxBlue has released a 1 minute-6 second video that compresses 21 months of construction. It was produced using a selection of 203,616 images captured by the three cameras.

SunTrust Park will include the first full LED lighting system in a major league stadium, and a canopy that shades about 60% of its seats from the sun.

Click here as well to take a 360-degree tour of the stadium. (You can move the image to see different parts of the park.)

 

Related Stories

Sports and Recreational Facilities | Oct 17, 2024

In the NIL era, colleges and universities are stepping up their sports facilities game

NIL policies have raised expectations among student-athletes about the quality of sports training and performing facilities, in ways that present new opportunities for AEC firms.

Designers | Oct 1, 2024

Global entertainment design firm WATG acquires SOSH Architects

Entertainment design firm WATG has acquired SOSH Architects, an interior design and planning firm based in Atlantic City, N.J. 

Products and Materials | Aug 31, 2024

Top building products for August 2024

BD+C Editors break down August's top 15 building products, from waterproof wall panel systems to portable indoor pickleball surface solutions.

Designers | Jul 29, 2024

Inclusive design for locker rooms: Providing equitable choice and access

SRG designers pose the question: What would it look like if everyone who wanted to use a restroom or locker room could? 

Great Solutions | Jul 23, 2024

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

Sports and Recreational Facilities | Jul 15, 2024

Smart stadiums: The future of sports and entertainment venues

These digitally-enhanced and connected spaces are designed to revolutionize the fan experience, enhance safety, and optimize operational efficiency, according to SSR's Will Maxwell, Smart Building Consultant.

Sports and Recreational Facilities | May 23, 2024

The Cincinnati Open will undergo a campus-wide renovation ahead of the expanded 2025 tournament

One of the longest-running tennis tournaments in the country, the Cincinnati Open will add a 2,000-seat stadium, new courts and player center, and more greenspace to create a park-like atmosphere.

Sports and Recreational Facilities | Apr 25, 2024

How pools can positively affect communities

Clark Nexsen senior architects Jennifer Heintz and Dorothea Schulz discuss how pools can create jobs, break down barriers, and create opportunities within communities.

Mixed-Use | Apr 9, 2024

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

Cultural Facilities | Apr 8, 2024

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021