The potential for a mega-earthquake in the Cascadia Subduction Zone is high, according to scientists, and that has provoked debate over the seismic resilience of Oregon schools.
Parents have concerns about the safety of the buildings in a major earthquake, and advocates for more resilient buildings also point out that schools are well suited for the role of disaster shelters if they are strong enough to withstand temblors. Schools tend to be evenly distributed throughout neighborhoods, and they often have large, open spaces like cafeterias and gymnasiums that easily can be converted to sleeping areas.
The school district in Beaverton, Ore., is using a $680 million bond to design its new schools to double as emergency shelters and be functional shortly after an earthquake. Its new $98 million high school is designed with an emergency generator, and plumbing and electric wiring constructed with emergency services in mind. These features cost the district $900,000.
A structural engineer that wrote a paper on Beaverton’s resilient school designs says that communities should have conversations about school resilience before putting bond measures to vote.
Related Stories
Codes and Standards | Jun 19, 2018
Structural engineered wood products exempt from new EPA formaldehyde ruling
Exempt products include structural plywood, oriented strand board (OSB).
Codes and Standards | Jun 18, 2018
Seattle City Council repeals controversial new per-worker tax on large employers
Measure was aimed at raising $50 million for homeless services, affordable housing.
Codes and Standards | Jun 14, 2018
Hardscape from development makes ‘1,000-year’ flood in Maryland worse
Impermeable concrete made it easier for water to overwhelm drainage system.
Codes and Standards | Jun 13, 2018
United States Resiliency Council announces support for Calif. earthquake resiliency bill
Measure would help cities identify structures that could fail in major quake.
Codes and Standards | Jun 12, 2018
Congestion pricing for cars is effective in reducing traffic, but a difficult sell
After three years, traffic congestion declined by 30% in London.
Codes and Standards | Jun 11, 2018
First RFP requiring modular construction on New York City housing project issued
Part of Housing 2.0 modular construction initiative.
Codes and Standards | Jun 6, 2018
Buffalo, N.Y., contractor exec pleads guilty to fraud for bid rigging on $750 million contract
LPCiminelli stops functioning as GC in fallout from the case.
Codes and Standards | Jun 6, 2018
LEED should be updated to combat climate change
Hasn’t kept pace with urgency of problem, says clean energy investor.
Codes and Standards | Jun 5, 2018
Sports stadiums and arenas showcase sustainability features
Green venues save owners money, gain positive publicity.
Codes and Standards | Jun 4, 2018
L.A. must transition to cleaner energy, boost transit to reach sustainability goals
City aims to reduce GHGs 60% by 2035 and 80% by 2050.