The potential for a mega-earthquake in the Cascadia Subduction Zone is high, according to scientists, and that has provoked debate over the seismic resilience of Oregon schools.
Parents have concerns about the safety of the buildings in a major earthquake, and advocates for more resilient buildings also point out that schools are well suited for the role of disaster shelters if they are strong enough to withstand temblors. Schools tend to be evenly distributed throughout neighborhoods, and they often have large, open spaces like cafeterias and gymnasiums that easily can be converted to sleeping areas.
The school district in Beaverton, Ore., is using a $680 million bond to design its new schools to double as emergency shelters and be functional shortly after an earthquake. Its new $98 million high school is designed with an emergency generator, and plumbing and electric wiring constructed with emergency services in mind. These features cost the district $900,000.
A structural engineer that wrote a paper on Beaverton’s resilient school designs says that communities should have conversations about school resilience before putting bond measures to vote.
Related Stories
Codes and Standards | Apr 9, 2018
U.K. business leaders call for zero-carbon buildings by 2030
Real estate, construction industry executives among those supporting the goal.
Codes and Standards | Apr 5, 2018
In Houston, proposed rules would require building above 500-year flood level
Change would impact 85,739 pieces of property.
Codes and Standards | Apr 4, 2018
New ASTM standard supports stucco use in construction
Provides way to measure tensile strength in vertical applications.
Codes and Standards | Apr 3, 2018
LEED v4.1 O+M for Existing Buildings available for beta testing
Update said to be most inclusive and transparent platform to date.
Codes and Standards | Apr 2, 2018
Experts chosen for ICC, ANCR buildings resilience benchmarks project
Specialists to focus on community preparedness for disasters.
Codes and Standards | Mar 29, 2018
Contractors have paid $5.2 million for failing local resident employee mandate on Detroit arena
Companies were only able to meet half of the 51% local worker requirement over course of the project.
Codes and Standards | Mar 28, 2018
Washington State moving to promote mass timber construction with legislation
Bill would require all 12-story or less public buildings to be built with mass timber.
Codes and Standards | Mar 27, 2018
Los Angeles appoints its first chief design officer
Responsibility for enhancing civic architecture and urban design.
Codes and Standards | Mar 26, 2018
National Roofing Contractors Assn., releases updates to its Roof Wind Designer app
Significant changes to online wind-load calculator.
Codes and Standards | Mar 22, 2018
Global construction waste to almost double by 2025
Concerns in Houston, Minnesota over environmental impacts.