flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Columbus State Community College’s new hospitality management and culinary arts building breaks ground

University Buildings

Columbus State Community College’s new hospitality management and culinary arts building breaks ground

DesignGroup is the architect for the project.


By David Malone, Associate Editor | July 2, 2018
Mitchell Hall

Rendering courtesy DesignGroup.

Mitchell Hall, Columbus State Community College’s new 80,000-sf, $33 million hospitality management and culinary arts building, has broken ground at 250 Cleveland Avenue in the Discovery District in Columbus, Ohio. The building will double the college’s Hospitality and Culinary Arts enrollment capacity to more than 1,500 students.

The building is positioned at the intersection of Cleveland and Mount Vernon Avenues, a point where the city and college meet. Mitchell Hall will amplify ground-floor activity by integrating first-floor dining, bakery, and on-display production kitchens with a variety of formal and casual exterior dining, socializing, and study spaces.

 

Mitchell Hall and Columbus State Community CollegeRendering courtesy of DesignGroup.

 

A three-story sky-lit space dubbed “The Culinary Hub” will act as the major organizing feature of the building. It will serve as a center of gravity for all of the internal building program elements and as the major entry points to campus and Cleveland Avenue.

 

See Also: Virginia Commonwealth has at least three major expansion projects under construction

 

Among the facilities many features will be seven teaching kitchens, a 100-seat full-service teaching restaurant and bar, a bakery and café, a 400-seat conference center, a 100-seat culinary theater, a beverage and mixology lab, food production gardens, and classrooms.

Mitchell Hall is scheduled to open in 2019.

Related Stories

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 19, 2014

Frames: the biggest value engineering tip

In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.

| Mar 17, 2014

Rem Koolhaas explains China's plans for its 'ghost cities'

China's goal, according to Koolhaas, is to de-incentivize migration into already overcrowded cities. 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

| Mar 7, 2014

Thom Mayne's high-tech Emerson College LA campus opens in Hollywood [slideshow]

The $85 million, 10-story vertical campus takes the shape of a massive, shimmering aircraft hangar, housing a sculptural, glass-and-aluminum base building.

| Mar 7, 2014

Chicago's 7 most threatened buildings: Guyon Hotel, Jeffrey Theater make the list

The 2014 edition of Preservation Chicago's annual Chicago's 7 list includes an L station house, public school, theater, manufacturing district, power house, and hotel.

| Mar 4, 2014

If there’s no ‘STEM crisis,’ why build more STEM schools?

Before you get your shorts in a knot, I have nothing against science, technology, engineering, or even mathematics; to the contrary, I love all four “STEM” disciplines (I’m lying about the math). But I question whether we need to be building K-12 schools that overly emphasize or are totally devoted to STEM.

| Feb 26, 2014

Adaptive reuse project brings school into historic paper mill

The project features nontraditional classrooms for collaborative learning, an arts and music wing, and a technologically sophisticated global resource center.

| Feb 24, 2014

First look: UC San Diego opens net-zero biological research lab

The facility is intended to be "the most sustainable laboratory in the world," and incorporates natural ventilation, passive cooling, high-efficiency plumbing, and sustainably harvested wood.  

boombox1
boombox2
native1

More In Category



Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021