flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Columbus State Community College’s Mitchell Hall set to open for the coming semester

University Buildings

Columbus State Community College’s Mitchell Hall set to open for the coming semester

DesignGroup designed the project.


By David Malone, Associate Editor | August 13, 2019
Mitchell hall exterior

All renderings courtesy Designgroup

Mitchell Hall, a $34.5 million project for Columbus State Community College, is set to double the enrollment capacity (to more than 1,500 students) for the school’s Hospitality Management and Culinary Arts program when it opens this fall.

The new 80,000-sf building features seven teaching kitchens, a 100-seat, full-service teaching restaurant and bar, a bakery and cafe, a 600-person conference center, a 100-seat culinary theater, a beverage and mixology lab, classrooms, and support spaces.

 

Mitchell hall restaurant

 

The building’s entry and exit point is the Culinary Hub, a three-story, sky-lit space that will also be a center of activity. The Culinary Hub is surrounded by first-floor dining, a bakery, and on-display kitchens with a variety of formal and casual exterior spaces for dining and studying. A covered outdoor classroom with outdoor cooking equipment and casual seating options will also sit adjacent to the Culinary Hub.

 

See Also: New Student Wellness Center at the University of Chicago begins construction

 

The teaching kitchens, teaching restaurant, and mixology lab all have large-scale windows that look out at the surrounding landscape and Columbus skyline. The culinary theater and conference room will set up Mitchell Hall to welcome guests outside of the school’s program and act as an engagement hub to address issues surrounding quality nutrition, food insecurity, and community education.

 

Mitchell Hall Culinary Hub

 

Mitchell hall teaching kitchen

Related Stories

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

Big Data | Jan 5, 2018

In the age of data-driven design, has POE’s time finally come?

At a time when research- and data-based methods are playing a larger role in architecture, there remains a surprisingly scant amount of post-occupancy research. But that’s starting to change.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Adaptive Reuse | Jan 4, 2018

Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house

The Packing House was originally built for the Santiago Orange Growers Association.

University Buildings | Dec 20, 2017

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.

University Buildings | Dec 4, 2017

The University of Nebraska’s new College of Business building highlights entrepreneur alumni and corporate leaders

Numerous storytelling spaces and displays are located throughout the building.

Wood | Nov 30, 2017

The first large-scale mass timber residence hall in the U.S. is under construction at the University of Arkansas

Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN collaborated on the design.

University Buildings | Nov 28, 2017

FXFOWLE and CO Architects collaborate on Columbia University School of Nursing building

The building has a ‘collaboration ribbon’ that runs throughout the building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021