flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Columbia University to begin construction on New York City’s first all-electric academic research building

University Buildings

Columbia University to begin construction on New York City’s first all-electric academic research building

KPF’s design uses significantly less energy than similar buildings and supports the school’s net-zero goals.


By Novid Parsi, Contributing Editor | April 10, 2024
Rendering RGB, courtesy KPF - Columbia University to begin construction on New York City’s first all-electric academic research building
Rendering RGB, courtesy KPF

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

With a design that uses significantly less energy than similar buildings, the Biomedical Research Building will outperform emission limits set by local law and is expected to perform 30% more efficiently than the commercial building benchmark. The facility also supports Columbia University’s plan to introduce no new fossil fuel infrastructure into campus buildings and to achieve campus-wide net-zero emissions by 2050. 

Because laboratories have greater ventilation requirements than other buildings, they require more robust mechanical systems, which typically result in increased energy usage. The design team worked with sustainability consultant Atelier Ten to create an all-electric research lab building that could handle the facility’s high heating loads. 

Illustration: RGB, courtesy KPF
Illustration: RGB, courtesy KPF

The Biomedical Research Building is heated and cooled with electric air source heat pumps that allow for energy recovery between the heating and cooling fluids, providing periods of free tempering during the year. Air-side energy recovery systems use waste heat to reduce the total energy needed to condition the building. 

The high-performance façade features a window-to-wall ratio below 50%. Exterior shading and a louver system reduce solar heat gain and glare while reflecting natural light into the labs.

The building’s design integrates biophilic elements such as green walls and natural and renewable materials in collaboration spaces. A large connecting stair encourages active circulation, and corner lounges foster collaboration among researchers.

On the Building Team:
Architect: Kohn Pedersen Fox (KPF) 
MEP engineer: AKF Group
Structural engineer: Hatfield Group
Sustainability consultant: Atelier Ten 
Lab planning consultant: Jacobs 
Construction manager: LF Driscoll Healthcare

Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF

 

Related Stories

Sports and Recreational Facilities | Nov 27, 2017

The University of Memphis unveils the new home of the men’s basketball program

The Laurie-Walton Family Basketball Center will provide a strong commitment to donor and VIP cultivation.

Adaptive Reuse | Nov 10, 2017

Austin’s first indoor shopping mall becomes Austin Community College’s new digital media center

Renovation of the defunct mall represents Phase 2 of ACC’s $100 million adaptive reuse project.

University Buildings | Nov 6, 2017

A reconstructed building sets the standard for future rehabs at Cornell

Early AE collaboration played a major role in moving this project forward efficiently. 

University Buildings | Oct 13, 2017

The University of Oklahoma receives its first residential colleges

The residential communities were designed by KWK Architects and combine living and learning amenities.

University Buildings | Oct 12, 2017

USC to debut new bioscience center next month

The building is designed to maximize recruitment and interaction of scientists and researchers.

University Buildings | Oct 12, 2017

The Center for Wounded Veterans is a first for a university campus

The Chez Family Foundation Center for Wounded Veterans in Higher Education is the first building of its kind on a U.S. college campus.

University Buildings | Oct 10, 2017

A 1920s cheese factory is now a university science building

Almost 15,000 sf of space was added to the original, four-story building.

Sustainability | Oct 9, 2017

New Arizona State University building will reach triple net-zero performance

The science and research complex will include an atrium biome filled with plants and water.

Higher Education | Sep 18, 2017

Campus landscape planning of the future: A University of Wisconsin-Madison case study

Recognizing that the future health of the campus and lake are interdependent, this innovative approach will achieve significant improvements in stormwater management and water quality within the university’s restored, more connected network of historic and culturally rich landscapes.

University Buildings | Sep 15, 2017

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

In 2016, more than 400 students were placed on the wait list due to lack of available on-campus housing.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021