flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Columbia University to begin construction on New York City’s first all-electric academic research building

University Buildings

Columbia University to begin construction on New York City’s first all-electric academic research building

KPF’s design uses significantly less energy than similar buildings and supports the school’s net-zero goals.


By Novid Parsi, Contributing Editor | April 10, 2024
Rendering RGB, courtesy KPF - Columbia University to begin construction on New York City’s first all-electric academic research building
Rendering RGB, courtesy KPF

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

With a design that uses significantly less energy than similar buildings, the Biomedical Research Building will outperform emission limits set by local law and is expected to perform 30% more efficiently than the commercial building benchmark. The facility also supports Columbia University’s plan to introduce no new fossil fuel infrastructure into campus buildings and to achieve campus-wide net-zero emissions by 2050. 

Because laboratories have greater ventilation requirements than other buildings, they require more robust mechanical systems, which typically result in increased energy usage. The design team worked with sustainability consultant Atelier Ten to create an all-electric research lab building that could handle the facility’s high heating loads. 

Illustration: RGB, courtesy KPF
Illustration: RGB, courtesy KPF

The Biomedical Research Building is heated and cooled with electric air source heat pumps that allow for energy recovery between the heating and cooling fluids, providing periods of free tempering during the year. Air-side energy recovery systems use waste heat to reduce the total energy needed to condition the building. 

The high-performance façade features a window-to-wall ratio below 50%. Exterior shading and a louver system reduce solar heat gain and glare while reflecting natural light into the labs.

The building’s design integrates biophilic elements such as green walls and natural and renewable materials in collaboration spaces. A large connecting stair encourages active circulation, and corner lounges foster collaboration among researchers.

On the Building Team:
Architect: Kohn Pedersen Fox (KPF) 
MEP engineer: AKF Group
Structural engineer: Hatfield Group
Sustainability consultant: Atelier Ten 
Lab planning consultant: Jacobs 
Construction manager: LF Driscoll Healthcare

Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF

 

Related Stories

University Buildings | Apr 2, 2019

Denning House completes at Stanford University

Ennead Architects designed the building.

University Buildings | Mar 27, 2019

Veterans Resource Center at Cypress College breaks ground

Sundt Construction is building the project.

Mixed-Use | Feb 21, 2019

An R&D-oriented innovation district is taking shape in the heart of Durham, N.C.

Its buildout has included converting old tobacco warehouses into offices and labs.

University Buildings | Jan 29, 2019

The Colorado School of Mines CoorsTek Center opens

Bohlin Cywinski Jackson designed the building.

University Buildings | Dec 17, 2018

SCUP and University of Pennsylvania School of Nursing release study results on lactation policy and facilities in U.S. higher education

There is a wide variability between how campuses accommodate the needs of breastfeeding mothers.

University Buildings | Dec 10, 2018

Suffolk breaks ground on large housing/dining complex for UMass Dartmouth

This is the first phase of a large construction/renovation plan for the school’s main campus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021