flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

College prep high school begins campus-wide transformation with 22,000-sf expansion project

Education Facilities

College prep high school begins campus-wide transformation with 22,000-sf expansion project

The expansion marks the first phase of the two-phase project.


By David Malone, Associate Editor | October 3, 2016

Rendering: WRNS Studio

A new 22,000-sf expansion project on Sonoma Academy’s 34-acre campus at the base of Taylor Mountain will add key academic, social, and cultural spaces to the independent college prep high school. The two-level education facility will act as the first of a two-phase campus transformation project.

San Francisco-based WRNS Studio designed the project to help achieve Sonoma Academy’s vision of creating a campus that will teach students about social, environmental, and food justice while fostering a hands-on teaching philosophy. The two-level facility is known as Grange & Studios. The top floor, which represents “The Grange” of Grange & Studios, has a teaching and commercial kitchen with a dining hall and outdoor learning spaces with flower, herb, and fruit tree gardens. The lower level, The Studios, has traditional STEM-inspire shops, art classrooms, technology rooms, media production studios, offices, and meeting spaces. The facility also has a vegetation-covered rooftop.

The green roof and cascading planters filter stormwater and rain water while a geo-exchange system, watershed block made with local soil, and photovoltaic panels to produce enough energy to offset the demand by over 15% mean that, when completed in July 2017, the buildings will be LEED Platinum, an Education Pilot for Well Building, and a Living Building Challenge candidate.

The second phase of the project will be focused on a new 450-seat performing arts theater and conservatory. Funding for the project has been provided entirely by private donations.

 

 

 

 

 

Related Stories

Education Facilities | Aug 21, 2018

Meet the new vo-techs

Career and technical education is preparing K-12 students earlier than ever for college and the job market.

Education Facilities | Aug 20, 2018

More districts are reusing empty offices, stores, and other buildings to upgrade their schools

Older schools, with their small windows and rooms and creaky infrastructure, are tough and expensive to retrofit.

Education Facilities | Aug 14, 2018

Making schools more secure is imperative, but how best to do that isn't settled yet

In the first 21 weeks of 2018 alone, there were 23 school shootings where someone was killed or injured, according to CNN.

Education Facilities | Aug 13, 2018

Is STEM running out of steam?

Has STEM, which the business community urged school districts to embrace, been oversold as a career path?

Education Facilities | Aug 7, 2018

High-tech instruction space trains students in manufacturing robots

Harley Ellis Devereaux served as lead designer and lab planner for the project.

Education Facilities | Jul 11, 2018

Why school architects must understand how students learn

Would instruction be more effective if students spent less time passively listening to lectures and more time actively learning through activities, discussions, and group work? 

Education Facilities | Jul 6, 2018

Building for growth: Supporting gender-specific needs in middle school design

Today, efforts toward equity in education encompass a wide spectrum of considerations including sex, gender identity, socio-economic background, and ethnicity to name a few.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021