flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago’s first citizenM hotel to be part of Sterling Bay’s mixed-use Michigan Ave. development

Mixed-Use

Chicago’s first citizenM hotel to be part of Sterling Bay’s mixed-use Michigan Ave. development

bKL will serve as the project’s lead architect.


By David Malone, Associate Editor | November 26, 2019
citizenM Chicago ground floor retail

Courtesy citizenM

Chicago’s first citizenM hotel is set to rise as part of Sterling Bay’s mixed-use development at 300 North Michigan Avenue, located between the Riverwalk and Millenium Park. 

The 47-story, 523-foot tower will include 289 residential units, 280 hotel rooms, and 25,000 sf of retail space. The ground floor retail will open directly to the street with the hotel and a terrace above. A subterranean, 22-parking-spot garage will also be included. 

The 280 hotel rooms will feature XL king-sized beds, an HD TV with a library of on-demand movies and streaming options via free WiFi, a rain shower, and customizable room ambiance – the blinds, TV, and lights are all enabled to change colors – controlled by an iPad.

 

See Also: Over 400 micro units spread across two communities under development in Austin

 

The interior’s, designed by Amsterdam-based design firm Concrete, will be inspired by the local community and feature a mix of contemporary art, photography, and objects by local artists. Chicago’s bKL will serve as the lead architect. Once completed, a subsidiary of citizenM will acquire the hotel.

The citizenM Chicago project will join other citizenM projects currently under development in the U.S. in Miami, Los Angeles, San Francisco, Seattle, and Washington, D.C. Locations in Boston and New York have recently opened.

Tags

Related Stories

Mixed-Use | Apr 24, 2017

Take a look at Brooklyn’s Domino Sugar Refinery redevelopment

The master plan features market-rate and affordable housing, mixed-use space, and a waterfront park with a 5-block long “Artifact Walk.”

Sports and Recreational Facilities | Apr 21, 2017

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

Mixed-Use | Apr 5, 2017

SOM-designed ‘vertical village’ is Thailand’s largest private-sector development ever

60,000 people will live and work in One Bangkok when it is completed in 2025.

Urban Planning | Mar 31, 2017

4 important things to consider when designing streets for people, not just cars

For the most part what you see is streets that have been designed with the car in mind—at a large scale for a fast speed.

High-rise Construction | Mar 31, 2017

Ping An Finance Center officially becomes the fourth tallest building in the world

The completed building sits between the Makkah Royal Clock Tower at 1,972 feet and One World Trade Center at 1,776 feet.

Mixed-Use | Mar 27, 2017

The Plant brings terrace-to-table living to Toronto

Curated Properties and Windmill Developments have teamed up to create a mixed-use building with food as the crux of the project.

Mixed-Use | Mar 21, 2017

Studio Gang commissioned to design its first Canadian building

The project will be a mixed-use tower at the southwest corner of Yonge and Delisle in Toronto.

Retail Centers | Mar 9, 2017

When everyone shops online, what happens to mixed-use retail?

NBBJ’s David Yuan explains how changing retail trends are creating new opportunities for urban experiences and public space. 

High-rise Construction | Mar 3, 2017

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021