flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Central Park’s Lasker Rink and Pool to undergo $150 million restoration project

Reconstruction & Renovation

Central Park’s Lasker Rink and Pool to undergo $150 million restoration project

The project will be the largest the Central Park Conservancy has ever undertaken.


By David Malone, Associate Editor | October 7, 2019
New Lasker Rink and Pool after renovation

All renderings courtesy Central Park Conservancy

The Central Park Conservancy has recently released details about the renovation of the Lasker Rink and Pool, the capstone project of the Conservancy’s 40-year campaign to restore Central Park. The project will restore the area’s ecosystem while creating a new pool and rink facility at the Harlem Meer.

The new facility will be integrated into the landscape by being built into the eastern side of the site with a green roof overlooking the area. It will be more open and accessible to visitors and, for the first time, the facility will support programming, access to restrooms, and amenities year-round. 

 

The Huddleston Arch

 

A new pool and outdoor splash pad will be built and a seasonal ice rink for skating and hockey will be installed. A boardwalk, accessed via an open-air pavilion on the shoreline, that travels through a series of small islands and a freshwater marsh will convert to a skating ribbon in winter.

 

Boardwalk/skating ribbon in winter

 

The existing Lasker Rink and Pool has acted as a physical and visual barrier to the north end for more than 60 years as it severed the Ravine landscape and Lock watercourse from the Harlem Meer. The new design provides unhindered access across to the north end of the Park by reconnecting the watercourse that runs through the Ravine so it flows freely into the Harlem Meer and by re-establishing the pedestrian path that once ran alongside it. 

 

See Also: KPF-designed CITIC tower is Beijing’s tallest

 

The project, slated to begin in spring of 2021, has a budget of $150 million, which includes a $40 million maintenance and capital repair fund. The City of New York has allocated $50 million to the project. The conservancy is committed to raising the remaining $100 million and overseeing the design and construction. The project is slated for completion in 2024.

Related Stories

Airports | Jun 26, 2017

Newark Liberty International Airport breaks ground on $2.4 billion redevelopment project

The project includes a new 1 million-sf terminal building with 33 domestic aircraft gates.

Retail Centers | Jun 21, 2017

Creating communities from defunct malls

It’s time to plan for the suburban retail reset—and it starts by rethinking the traditional mall.

Reconstruction & Renovation | May 30, 2017

Achieving deep energy retrofits in historic and modern-era buildings [AIA course]

Success in retrofit projects requires an entirely different mindset than in new construction, writes Randolph Croxton, FAIA, LEED AP, President of Croxton Collaborative Architects. 

Reconstruction & Renovation | Apr 27, 2017

One of the last abandoned high-rises in Detroit’s downtown core moves one step closer to renovation

Kraemer Design has been selected as the architect of record and historic consultant on the Detroit Free Press building renovations.

Office Buildings | Apr 18, 2017

Heineken USA Headquarters redesign emphasizes employee interaction

An open plan with social hubs maximizes co-working and engagement.

Reconstruction & Renovation | Mar 30, 2017

Waldorf Astoria New York to undergo massive renovation

Skidmore, Owings & Merrill and Pierre-Yves Rochon prepared the designs for what will be one of the most complex and intensive landmark preservation efforts in New York City history.

Office Buildings | Mar 27, 2017

New York warehouse to become an office mixing industrial and modern aesthetics

The building is located in West Chelsea between the High Line and West Street.

Reconstruction & Renovation | Mar 16, 2017

Pols are ready to spend $1T on rebuilding America’s infrastructure. But who will pick which projects benefit?

The accounting and consulting firm PwC offers the industrial sector a five-step approach to getting more involved in this process.

Reconstruction & Renovation | Mar 16, 2017

Brooklyn’s ‘Batcave’ will become a series of fabrication shops

The century-old building will be turned into fabrication shops in wood, metal, ceramics, textiles, and printmaking.

Reconstruction & Renovation | Feb 16, 2017

Stalled Conference House Park pavilion renovation moving forward

The pavilion has been awaiting repair since storm damage in 2011 rendered the structure unsafe for the public.

boombox1
boombox2
native1

More In Category




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021