flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Carolina Gaming Arena completes at UNC Chapel Hill

University Buildings

Carolina Gaming Arena completes at UNC Chapel Hill

Clark Nexsen designed the project.


By David Malone | May 17, 2021
Carolina Gaming Arena

Photos: Hayden Christopher

Carolina Gaming Arena, the University of North Carolina ’s (UNC) first esports facility, was recently completed in March.

The gaming arena is housed in the lowest level of Craige Hall, which is centrally located on UNC’s campus. At night, the glow of the space spills across the adjacent lawn, acting as a natural advertisement of the space to many students passing by one of the campus’s main thoroughfares.

Carolina Gaming Arena includes 36 PC stations and three game console zones. A 16-foot gaming wall comprised of screens is located on one wall, with a viewing area positioned nearby for gamers to watch and cheer on their teammates.

 

UNC Gaming Arena PC stations

 

Upon entering the arena, which is free to all student users, players head to a check-in station where they are provided with the status of availability, progress of current games, and to check leaderboards. A virtual concierge appears on one of the 7-foot vertical screens mounted on columns will be available to help new gamers.

Clark Nexsen provided architecture, MEP, and fire protection for the arena. Troy Hutchins Construction built the project.

 

Carolina Gaming Arena interview couch

Related Stories

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

University Buildings | Jun 14, 2021

Radford University’s new $80.5 million Center for Adaptive Innovation and Creativity

Hord Coplan Macht designed the project in collaboration with William Rawn Associates.

Education Facilities | Jun 4, 2021

Three ProConnect events coming this fall: Sustainability (Nov 2-3), Education (Nov 16-17), Multifamily (Dec 12-14)

SGC Horizon ProConnect 2021 schedule for Education, Multifamily, Office, and Single Family events.

University Buildings | Jun 1, 2021

Georgia Southern’s new $60 million Engineering and Research Building completes

The facility will serve as the new epicenter for engineering excellence and innovation in southeast Georgia.

University Buildings | May 26, 2021

Harvard University Science and Engineering Complex completes

Behnisch Architekten designed the project.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021