flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CareerBuilder’s Chicago HQ undergoes renovation

Office Buildings

CareerBuilder’s Chicago HQ undergoes renovation

Perkins and Will designed the project.


By David Malone, Associate Editor | February 13, 2020
CareerBuilder HQ central stair and reception

ll photos courtesy Perkins and WIll

The CareerBuilder HQ in Chicago occupies 75,000-sf across three and a half floors at 200 N LaSalle Drive. The renovation project turned the workspace into an open-plan concept that houses executive staff, administrative staff, and sales in an inclusive and non-hierarchical workplace.

Visitors and employees are welcomed into the space via a multi-use lounge and pantry space and a wide reception area that serves as a large hub. Deeper into the space, a centrally-located feature stairway functions as a main artery to connect all of the levels. The stairs are framed by two exposed columns, encased and illuminated within corrugated polycarbonate sheets that display the building’s industrial interior. A training center is separated from other areas with a garage door to allow the center to be acoustically isolated when needed and open when not in use.

 

CareerBuilder HQ downstairs mural

 

Tall partition workstations and private offices were eliminated to strip the space of hierarchical design elements and were replaced with low partitions and benching-style workstations for a more horizontal organizational structure. The workspace is split into neighborhoods to promote movement and employee connections through spatial planning and vertical connections. Conference rooms, which were wrapped around the core to allow natural light to permeate the office throughout, and phone rooms were integrated into the floor plan to provide employees with breakout spaces for meetings and quiet focus.

 

See Also: 1010 On-The-Rhine creates a walkable destination in an underutilized part of Cincinnati

 

In order to help with employee health and wellbeing, uplighting was installed to help reduce glare and eye strain, workstations were outfitted with height-adjustable desks, and the dispersion of smaller breakout spaces encourages employees to move around the office throughout the day.

 

CareerBuilder HQ open office space

 

CareerBuilder HQ conference rooms

 

CareerBuild HQ upstairs kitchenette

Related Stories

Office Buildings | Feb 3, 2021

NBCU News Group unveils new Washington bureau and studios

The project spans six floors and 80,000 sf.

Office Buildings | Feb 3, 2021

A towering helix will mark the spot at Amazon’s corporate headquarters in Virginia

The tech giant has invested $2.5 billion in a project that will encompass five office buildings for 25,000 employees.

Office Buildings | Feb 1, 2021

609 W. Randolph begins construction in Chicago’s West Loop Gate

Antunovich Associates designed the project.

Office Buildings | Jan 27, 2021

New creative office space completes in Silicon Beach

SPF:architects designed the project.

Office Buildings | Jan 19, 2021

Anchorage to receive new glacier-inspired office building

Perkins&Will is designing the building.

Laboratories | Jan 14, 2021

New hub for Danish robot developers unveiled

3XN designed the project.

Office Buildings | Jan 12, 2021

Epic Games purchases North Carolina mall to convert into new HQ

The video game company is currently valued at over $17 billion thanks to Fortnite, its massively popular battle royale game.

Architects | Jan 5, 2021

Ware Malcomb finds itself in the mix for multiple diverse projects

Its latest completion is an office/factory/warehouse combo for one of Marvin Window’s brands.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

boombox1
boombox2
native1

More In Category

Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021